ITAC Assessment: WV0169
ITAC logo
ITAC Assessment: WV0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Speciality chemicals
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 1,263,240
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $430,629 19,429,660
kWh
Electricity Demand $205,429 28,738
kW-mo/yr
Natural Gas $1,080,973 308,617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $341,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $152,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $542 $528 $542
15,826
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,580 $135 $1,580
46,307
kWh
- - -
03 2.1213: Direct warmest air to combustion intake $23,520 $16,260 - $23,520
-
MMBtu
- -
04 2.2113: Repair or replace steam traps $100,000 $13,000 - $100,000
-
MMBtu
- -
05 2.2511: Insulate bare equipment $146 $74 - $146
-
MMBtu
- -
06 2.1213: Direct warmest air to combustion intake $8,863 $14,000 - $8,863
-
MMBtu
- -
07 2.2511: Insulate bare equipment $176 $44 - $176
-
MMBtu
- -
08 2.2162: Reduce excess steam bleeding $26,581 $45,000 - $26,581
-
MMBtu
- -
09 2.7241: Install outside air damper / economizer on hvac unit $4,154 $7,500 $4,154
126,905
kWh
- - -
10 2.2423: Install waste heat boiler to produce steam $135,268 $200,000 - $135,268
-
MMBtu
- -
11 3.5217: Reuse / recycle/ sell paper products $17,690 $6,000 - - $17,690
-
lb
-
12 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,647 $11,000 - - $2,647
-
lb
-
13 4.424: Improve space comfort conditioning $20,000 $8,000 - - - $20,000
TOTAL RECOMMENDED $341,167 $321,541 $6,276
189,038
kWh
$294,554
-
MMBtu
$20,337
-
lb
$20,000
TOTAL IMPLEMENTED $152,925 $51,788 $542
15,826
kWh
$132,383
-
MMBtu
- $20,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs