| Assessment Year | 1999 |
|---|---|
| Principal Product | Speciality chemicals |
| NAICS |
n/a
|
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
1,263,240
ft2
|
| Annual Production | 35,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $430,629 | 19,429,660 |
kWh
|
$0.022 |
| Electricity Demand | $205,429 | 28,738 |
kW-mo/yr
|
$7.15 |
| Natural Gas | $1,080,973 | 308,617 |
MMBtu
|
$3.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $341,167 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $152,925 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $542 | $528 |
$542
15,826
kWh
|
- | - | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,580 | $135 |
$1,580
46,307
kWh
|
- | - | - | |
| 03 | 2.1213: Direct warmest air to combustion intake | $23,520 | $16,260 | - |
$23,520
-
MMBtu
|
- | - | |
| 04 | 2.2113: Repair or replace steam traps | $100,000 | $13,000 | - |
$100,000
-
MMBtu
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $146 | $74 | - |
$146
-
MMBtu
|
- | - | |
| 06 | 2.1213: Direct warmest air to combustion intake | $8,863 | $14,000 | - |
$8,863
-
MMBtu
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $176 | $44 | - |
$176
-
MMBtu
|
- | - | |
| 08 | 2.2162: Reduce excess steam bleeding | $26,581 | $45,000 | - |
$26,581
-
MMBtu
|
- | - | |
| 09 | 2.7241: Install outside air damper / economizer on hvac unit | $4,154 | $7,500 |
$4,154
126,905
kWh
|
- | - | - | |
| 10 | 2.2423: Install waste heat boiler to produce steam | $135,268 | $200,000 | - |
$135,268
-
MMBtu
|
- | - | |
| 11 | 3.5217: Reuse / recycle/ sell paper products | $17,690 | $6,000 | - | - |
$17,690
-
lb
|
- | |
| 12 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,647 | $11,000 | - | - |
$2,647
-
lb
|
- | |
| 13 | 4.424: Improve space comfort conditioning | $20,000 | $8,000 | - | - | - | $20,000 | |
| TOTAL RECOMMENDED | $341,167 | $321,541 |
$6,276
189,038
kWh
|
$294,554
-
MMBtu
|
$20,337
-
lb
|
$20,000 | ||
| TOTAL IMPLEMENTED | $152,925 | $51,788 |
$542
15,826
kWh
|
$132,383
-
MMBtu
|
- | $20,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs