ITAC Assessment: UL2410
ITAC logo
ITAC Assessment: UL2410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Miscellaneous Machined Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 66,000
ft2
Annual Production 46,800
units
Production Hrs. Annual 2,960
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,130 1,140,480
kWh
Electricity Demand $36,944 3,725
kW-mo/yr
Electricity Fees $12,576 -
Natural Gas $16,925 2,410
MMBtu
TOTAL YEARLY COSTS $162,575
RECOMMENDED SAVINGS* $82,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,828 $3,060 $12,828
152,193
kWh
- -
02 2.9114: Use solar heat to make electricty $52,875 $349,289 $43,886
520,658
kWh
$8,989
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,202 $4,083 $7,028
83,367
kWh
$3,174
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $6,357 $1,200 $3,782
44,864
kWh
- $2,575
-
MMBtu
TOTAL RECOMMENDED $82,262 $357,632 $67,524
801,082
kWh
$12,163
-
kW-mo/yr
$2,575
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs