ITAC Assessment: LS0007
ITAC logo
ITAC Assessment: LS0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Paper Towels, Mess Trays, Sponges, Paper Plates
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 80,558
ft2
Annual Production 338,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,786 1,169,274
kWh
Electricity Demand $33,600 3,648
kW-mo/yr
TOTAL YEARLY COSTS $129,386
RECOMMENDED SAVINGS* $20,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,612

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7124: Make a practice of turning off lights when not needed $883 - $883
10,774
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,322 $1,040 $1,805
22,038
kWh
$517
-
kW-mo/yr
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $2,729 - $2,729
33,308
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,699 $22,680 $11,262
137,480
kWh
$3,437
-
kW-mo/yr
05 2.7447: Install vinyl strip / high speed / air curtain doors $45 $70 $45
549
kWh
-
TOTAL RECOMMENDED $20,678 $23,790 $16,724
204,149
kWh
$3,954
-
kW-mo/yr
TOTAL IMPLEMENTED $3,612 - $3,612
44,082
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs