ITAC Assessment: KG0071
ITAC logo
ITAC Assessment: KG0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cotton seed oil, lint meal, and hull
NAICS
n/a
SIC 2074: Cottonseed Oil Mills
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 90,000
ton
Production Hrs. Annual 7,920
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,578 9,892,732
kWh
Electricity Demand $261,234 20,277
kW-mo/yr
Electricity Fees $9,097 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $641,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $503,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $134,608 $2,000,000 $327,304
14,400,645
kWh
- $(-192,696.0)
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $33,535 $15,675 $17,876
732,708
kWh
$15,659
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $26,966 $37,100 $14,718
603,165
kWh
$12,248
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,406 $12,000 $3,119
58,910
kWh
$287
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $722 $1,230 $722
29,601
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $467 $194 $467
7,327
kWh
- - - -
07 3.1192: Reduce scrap production $414,056 $1,500 - - - - $414,056
-
lb
08 3.5131: Recycle white water $27,769 $2,930 - - - $27,769
-
Tgal
-
TOTAL RECOMMENDED $641,529 $2,070,629 $364,206
15,832,356
kWh
$28,194
-
kW-mo/yr
$(-192,696.0)
-
MMBtu
$27,769
-
Tgal
$414,056
-
lb
TOTAL IMPLEMENTED $503,515 $58,629 $33,783
1,372,801
kWh
$27,907
-
kW-mo/yr
- $27,769
-
Tgal
$414,056
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs