ITAC Assessment: MI0231
ITAC logo
ITAC Assessment: MI0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Cosmetics
NAICS 322291: Sanitary Paper Product Manufacturing
SIC 2676: Sanitary Paper Products
Sales Range $1
M
to 5
M
# of Employees 19
Plant Area 23,000
ft2
Annual Production 7,677,500
pieces
Production Hrs. Annual 1,820
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,926 499,455
kWh
Electricity Demand $34,342 3,565
kW-mo/yr
Electricity Fees $19,201 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $30,009 $1,800 $23,516
102,242
kWh
$6,493
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,144 $1,660 $17,367
75,507
kWh
$777
-
kW-mo/yr
-
03 4.821: Pay bills on time to avoid late fees $13,801 $480 - - $13,801
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,235 $2,050 $6,696
29,110
kWh
$539
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $6,801 $800 $5,329
23,168
kWh
$1,472
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,414 $80 $5,547
24,116
kWh
$867
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $4,040 $4,550 - $4,040
-
kW-mo/yr
-
08 2.4323: Use optimum size and capacity equipment $3,835 $4,691 $3,480
15,132
kWh
$355
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,123 $1,160 $2,449
10,647
kWh
$674
-
kW-mo/yr
-
10 2.6127: Maintain air filters by cleaning or replacement $1,549 $843 $1,212
5,271
kWh
$337
-
kW-mo/yr
-
11 2.2628: Utilize a less expensive cooling method $1,120 $1,498 $879
3,822
kWh
$241
-
kW-mo/yr
-
TOTAL RECOMMENDED $96,071 $19,612 $66,475
289,015
kWh
$15,795
-
kW-mo/yr
$13,801
TOTAL IMPLEMENTED $79,841 $6,823 $55,420
240,951
kWh
$10,620
-
kW-mo/yr
$13,801
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs