ITAC Assessment: UD1035
ITAC logo
ITAC Assessment: UD1035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Closures
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3466: Crowns and Closures
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 465,000
ft2
Annual Production 5,000,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $497,721 15,481,200
kWh
Electricity Demand $633,786 26,265
kW-mo/yr
Electricity Fees $17,554 -
Natural Gas $265,254 76,289
MMBtu
TOTAL YEARLY COSTS $1,414,315
RECOMMENDED SAVINGS* $76,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,284

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $22,050 - $6,176
192,095
kWh
$15,874
-
kW-mo/yr
- - -
02 2.6212: Turn off equipment during breaks, reduce operating time $128 - $128
3,979
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,591 $604 $14,590
453,817
kWh
$15,001
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $6,603 $6,300 $2,134
66,366
kWh
$4,469
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,106 $5,256 $1,823
56,706
kWh
$5,349
-
kW-mo/yr
- $548 $386
06 2.7224: Reduce space conditioning during non-working hours $150 $50 - - $150
-
MMBtu
- -
07 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $10,297 $12,000 - - $10,297
-
MMBtu
- -
TOTAL RECOMMENDED $76,925 $24,210 $24,851
772,963
kWh
$40,693
-
kW-mo/yr
$10,447
-
MMBtu
$548 $386
TOTAL IMPLEMENTED $30,284 $5,256 $8,127
252,780
kWh
$21,223
-
kW-mo/yr
- $548 $386
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs