Assessment Year | 2000 |
---|---|
Principal Product | Hydraulic, Water, and Air Hoses |
NAICS |
n/a
|
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
140,000
ft2
|
Annual Production | 30,000,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,625 | 7,027,550 |
kWh
|
$0.031 |
Electricity Demand | $106,689 | 16,546 |
kW-mo/yr
|
$6.45 |
Electricity Fees | $28,950 | - |
|
- |
Natural Gas | $44,597 | 13,327 |
MMBtu
|
$3.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,436 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,598 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,236 | $1,860 |
$4,737
147,714
kWh
|
$1,499
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,550 | $740 |
$1,123
34,877
kWh
|
$427
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,619 | $16,000 |
$3,387
105,510
kWh
|
$2,232
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.4114: Replace city water with recycled water via cooling tower | $3,741 | $14,500 |
$(-384.0)
(-12,016)
kWh
|
$(-163.0)
-
kW-mo/yr
|
$4,788
-
Tgal
|
- | $(-500.0) | - | |
05 | 3.4113: Treat and reuse rinse waters | $3,598 | $6,375 | - | - |
$5,098
-
Tgal
|
- | - | $(-1,500.0) | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,130 | $2,150 |
$1,414
43,962
kWh
|
$716
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.5218: Reuse / recycle/ sell rubber products | $1,562 | - | - | - | - |
$1,562
-
lb
|
- | - | |
TOTAL RECOMMENDED | $24,436 | $41,625 |
$10,277
320,047
kWh
|
$4,711
-
kW-mo/yr
|
$9,886
-
Tgal
|
$1,562
-
lb
|
$(-500.0) | $(-1,500.0) | ||
TOTAL IMPLEMENTED | $3,598 | $6,375 | - | - |
$5,098
-
Tgal
|
- | - | $(-1,500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs