Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,130

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UK1916 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $29,402 $2,614
UK1916 #05 Y:2019 Air condition only space necessary $4,922 $11,550
UK1916 #04 Y:2019 Reduce space conditioning during non-working hours $195 $75
UK1916 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $16,394 $25,674
UK1916 #02 Y:2019 Make a practice of turning off lights when not needed $18,894 -
UK1916 #01 Y:2019 Minimize non-essential material in heat treatment process $1,170 -
UK1915 #07 Y:2019 Optimize plant power factor $127,719 $54,495
UK1915 #06 Y:2019 Insulate bare equipment $13,534 $26,305
UK1915 #05 Y:2019 Replace treated water with well / surface water $53,903 $10,200
UK1915 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $19,983 $21,695
UK1915 #03 Y:2019 Install occupancy sensors $259 $260
UK1915 #02 Y:2019 Re-size charging openings or add a movable door on equipment $7,951 $17,032
UK1915 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $3,711 $2,510
UK1914 #10 Y:2019 Optimize plant power factor $14,446 $12,425
UK1914 #09 Y:2019 Utilize higher efficiency lamps and/or ballasts $17,556 $21,155
UK1914 #08 Y:2019 Reduce illumination to minimum necessary levels $145 $80
UK1914 #07 Y:2019 Make a practice of turning off lights when not needed $150 -
UK1914 #06 Y:2019 Meter recycled water (to reduce sewer charges) $4,746 $1,370
UK1914 #05 Y:2019 Turn off equipment when not in use $8,187 -
UK1914 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $12,233 $8,100