ITAC Assessment: UK1915
ITAC logo
ITAC Assessment: UK1915
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Ammunition Containers
NAICS 332439: Other Metal Container Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 75,000
ft2
Annual Production 140,000
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,428 2,137,920
kWh
Electricity Demand $266,968 14,799
kW-mo/yr
Electricity Fees $2,527 -
Natural Gas $200,010 30,941
MMBtu
Waste Disposal Costs
Water Usage $90,568 25,630
Tgal
Water Disposal $115,919 25,630
Tgal
Other Liquid (non-haz) $11,229 1
gal
TOTAL YEARLY COSTS $760,649
RECOMMENDED SAVINGS* $227,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,711 $2,510 $875
25,725
kWh
$2,836
-
kW-mo/yr
- - - -
02 2.1122: Re-size charging openings or add a movable door on equipment $7,951 $17,032 $(-624.0)
(-18,346)
kWh
$(-2,039.0)
-
kW-mo/yr
- $10,614
-
MMBtu
- -
03 2.7135: Install occupancy sensors $259 $260 $259
7,629
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $19,983 $21,695 $4,956
145,752
kWh
$15,027
-
kW-mo/yr
- - - -
05 3.4159: Replace treated water with well / surface water $53,903 $10,200 $(-597.0)
(-17,546)
kWh
$(-1,948.0)
-
kW-mo/yr
- - $24,696
-
Tgal
$31,752
-
Tgal
06 2.2511: Insulate bare equipment $13,534 $26,305 - - - $13,534
-
MMBtu
- -
07 2.3212: Optimize plant power factor $127,719 $54,495 - - $127,719 - - -
TOTAL RECOMMENDED $227,060 $132,497 $4,869
143,214
kWh
$13,876
-
kW-mo/yr
$127,719 $24,148
-
MMBtu
$24,696
-
Tgal
$31,752
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs