ITAC Assessment: UK1916
ITAC logo
ITAC Assessment: UK1916
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product automatic transmission gears
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 240,000
ft2
Annual Production 60,813,736
units
Production Hrs. Annual 8,064
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $564,895 20,606,400
kWh
Electricity Demand $714,403 51,773
kW-mo/yr
Electricity Fees $4,343 -
Natural Gas $407,014 66,342
MMBtu
Waste Disposal Costs
Water Usage $9,620 2,395
Tgal
Water Disposal $21,173 2,395
Tgal
Other Liquid (non-haz) $27 1
gal
TOTAL YEARLY COSTS $1,721,475
RECOMMENDED SAVINGS* $323,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2312: Minimize non-essential material in heat treatment process $1,170 - $1,170
43,332
kWh
- - - -
02 2.7124: Make a practice of turning off lights when not needed $18,894 - $10,724
397,200
kWh
$8,170
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,394 $25,674 $9,356
346,519
kWh
$7,038
-
kW-mo/yr
- - -
04 2.7224: Reduce space conditioning during non-working hours $195 $75 $195
7,239
kWh
- - - -
05 2.7229: Air condition only space necessary $4,922 $11,550 $4,922
182,290
kWh
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $29,402 $2,614 $12,229
452,922
kWh
- - - $17,173
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,602 $2,270 $8,153
301,948
kWh
- - - $11,449
08 2.8114: Change rate schedules or other changes in utility service $6,946 - - - $6,946 - -
09 2.2414: Use waste heat from hot flue gases to preheat $86,132 $206,000 - - - $86,132
-
MMBtu
-
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $139,706 $225,000 $42,392
1,570,061
kWh
$138,427
-
kW-mo/yr
- $(-41,113.0)
-
MMBtu
-
TOTAL RECOMMENDED $323,363 $473,183 $89,141
3,301,511
kWh
$153,635
-
kW-mo/yr
$6,946 $45,019
-
MMBtu
$28,622
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs