Assessment Year | 2019 |
---|---|
Principal Product | automatic transmission gears |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
240,000
ft2
|
Annual Production | 60,813,736
units
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $564,895 | 20,606,400 |
kWh
|
$0.027 | |
Electricity Demand | $714,403 | 51,773 |
kW-mo/yr
|
$13.80 | |
Electricity Fees | $4,343 | - |
|
- | |
Natural Gas | $407,014 | 66,342 |
MMBtu
|
$6.14 | |
Waste Disposal Costs | |||||
Water Usage | $9,620 | 2,395 |
Tgal
|
$4.02 | |
Water Disposal | $21,173 | 2,395 |
Tgal
|
$8.84 | |
Other Liquid (non-haz) | $27 | 1 |
gal
|
$27.00 | |
TOTAL YEARLY COSTS | $1,721,475 | ||||
RECOMMENDED SAVINGS* | $323,363 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2312: Minimize non-essential material in heat treatment process | $1,170 | - |
$1,170
43,332
kWh
|
- | - | - | - | |
02 | 2.7124: Make a practice of turning off lights when not needed | $18,894 | - |
$10,724
397,200
kWh
|
$8,170
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,394 | $25,674 |
$9,356
346,519
kWh
|
$7,038
-
kW-mo/yr
|
- | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $195 | $75 |
$195
7,239
kWh
|
- | - | - | - | |
05 | 2.7229: Air condition only space necessary | $4,922 | $11,550 |
$4,922
182,290
kWh
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $29,402 | $2,614 |
$12,229
452,922
kWh
|
- | - | - | $17,173 | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,602 | $2,270 |
$8,153
301,948
kWh
|
- | - | - | $11,449 | |
08 | 2.8114: Change rate schedules or other changes in utility service | $6,946 | - | - | - | $6,946 | - | - | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $86,132 | $206,000 | - | - | - |
$86,132
-
MMBtu
|
- | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $139,706 | $225,000 |
$42,392
1,570,061
kWh
|
$138,427
-
kW-mo/yr
|
- |
$(-41,113.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $323,363 | $473,183 |
$89,141
3,301,511
kWh
|
$153,635
-
kW-mo/yr
|
$6,946 |
$45,019
-
MMBtu
|
$28,622 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs