| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0530 #08 Y:2019 | 08 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $1,535 | $5,998 | |
| UF0530 #07 Y:2019 | 07 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,876 | $421 | |
| UF0530 #06 Y:2019 | 06 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $3,402 | - | |
| UF0530 #05 Y:2019 | 05 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $5,859 | $22,491 | |
| UF0530 #04 Y:2019 | 04 | 2019 | Recover waste heat from equipment | $43,693 | $25,000 | |
| UF0530 #03 Y:2019 | 03 | 2019 | Recover waste heat from equipment | $47,739 | $25,000 | |
| UF0530 #02 Y:2019 | 02 | 2019 | Use most efficient type of electric motors | $60,494 | $202,420 | |
| UF0530 #01 Y:2019 | 01 | 2019 | Utilize controls to operate equipment only when needed | $94,823 | $80,000 | |
| UF0529 #08 Y:2019 | 08 | 2019 | Reduce or eliminate waste | $24,322 | $15,000 | |
| UF0529 #07 Y:2019 | 07 | 2019 | Analyze flue gas for proper air/fuel ratio | $1,882 | $2,800 | |
| UF0529 #06 Y:2019 | 06 | 2019 | Use waste heat from hot flue gases to preheat | $2,139 | $10,000 | |
| UF0529 #05 Y:2019 | 05 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $11,158 | $9,464 | |
| UF0529 #04 Y:2019 | 04 | 2019 | Recover waste heat from equipment | $12,645 | $10,000 | |
| UF0529 #03 Y:2019 | 03 | 2019 | Reschedule plant operations or reduce load to avoid peaks | $29,180 | $25,340 | |
| UF0529 #02 Y:2019 | 02 | 2019 | Utilize controls to operate equipment only when needed | $67,747 | $55,000 | |
| UF0529 #01 Y:2019 | 01 | 2019 | Replace existing chiller with high efficiency model | $109,260 | $320,000 | |
| UF0528 #08 Y:2019 | 08 | 2019 | Relocate oven / furnace to more efficient location | $1,676 | $5,000 | |
| UF0528 #07 Y:2019 | 07 | 2019 | Install occupancy sensors | $2,054 | $1,025 | |
| UF0528 #06 Y:2019 | 06 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $2,284 | $3,000 | |
| UF0528 #05 Y:2019 | 05 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $3,168 | $6,439 |