ITAC Assessment: UF0528
ITAC logo
ITAC Assessment: UF0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Dairy Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 220,000
ft2
Annual Production 70,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $892,704 14,009,996
kWh
Electricity Demand $255,104 30,965
kW-mo/yr
Electricity Fees $1,272 -
Natural Gas $146,968 51,084
MMBtu
Waste Disposal Costs
Water Usage $83,848 50,773
Tgal
Water Disposal $412,987 44,847
Tgal
TOTAL YEARLY COSTS $1,792,883
RECOMMENDED SAVINGS* $28,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2522: Isolate hot or cold equipment $6,559 $10,250 $6,559
102,960
kWh
-
02 2.1222: Install turbulators $5,011 $7,500 - $5,011
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,410 $1,400 - $4,410
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,248 $456 $3,248
50,990
kWh
-
05 2.4222: Install adequate dryers on air lines to eliminate blowdown $3,168 $6,439 $3,168
49,733
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,284 $3,000 $2,284
35,854
kWh
-
07 2.7135: Install occupancy sensors $2,054 $1,025 $2,054
32,246
kWh
-
08 2.1117: Relocate oven / furnace to more efficient location $1,676 $5,000 - $1,676
-
MMBtu
TOTAL RECOMMENDED $28,410 $35,070 $17,313
271,783
kWh
$11,097
-
MMBtu
TOTAL IMPLEMENTED $12,597 $11,981 $7,586
119,090
kWh
$5,011
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs