Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,047

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0646 #11 Y:2026 Level two – install control system using iiot devices with communication capabilities to store data to the cloud $4,169 $15,000
UF0646 #10 Y:2026 Improve space comfort conditioning $45,534 $22,638
UF0646 #09 Y:2026 Install automatic part storage / retreval system $16,655 $75,000
UF0646 #08 Y:2026 Substitute compressed air cooling with water or air cooling $631 $2,700
UF0646 #07 Y:2026 Reduce the pressure of compressed air to the minimum required $770 -
UF0646 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,900 -
UF0646 #05 Y:2026 Utilize controls to operate equipment only when needed $2,780 $7,500
UF0646 #04 Y:2026 Install soft-start to eliminate nuisance trips $5,657 $8,456
UF0646 #03 Y:2026 Use demand controller or load shedder $19,731 $14,663
UF0646 #02 Y:2026 Use most efficient type of electric motors $27,587 $20,669
UF0646 #01 Y:2026 Use solar heat to make electricty $97,535 $375,213
UF0645 #09 Y:2026 Improve space comfort conditioning $28,846 $31,213
UF0645 #08 Y:2026 Replace existing equipment with more suitable substitutes $28,500 $1,912
UF0645 #07 Y:2026 Install timers on light switches in little used areas $820 $315
UF0645 #06 Y:2026 Use waste heat from hot flue gases to preheat $1,294 $1,610
UF0645 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $1,638 -
UF0645 #04 Y:2026 Minimize condenser cooling water temperature $4,516 $6,528
UF0645 #03 Y:2026 Install timers on light switches in little used areas $4,803 $20,000
UF0645 #02 Y:2026 Utilize controls to operate equipment only when needed $10,771 $25,570
UF0645 #01 Y:2026 Use demand controller or load shedder $15,284 $12,285