Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,076

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0649 #09 Y:2026 Re-arrange equipment layout to reduce labor costs $3,096 $3,360
UF0649 #08 Y:2026 Turn off steam / hot water lines leading to space heating units $1,026 $3,500
UF0649 #07 Y:2026 Install soft-start to eliminate nuisance trips $2,089 $1,924
UF0649 #06 Y:2026 Minimize condenser cooling water temperature $2,060 $1,508
UF0649 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $2,903 -
UF0649 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $4,330 $4,330
UF0649 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $18,881 $43,740
UF0649 #02 Y:2026 Direct warmest air to combustion intake $28,912 $11,000
UF0649 #01 Y:2026 Use solar heat to make electricty $187,521 $772,200
UF0648 #08 Y:2026 Re-arrange equipment layout to reduce labor costs $3,096 $3,360
UF0648 #07 Y:2026 Improve space comfort conditioning $28,544 $6,210
UF0648 #06 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,879 -
UF0648 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $2,413 -
UF0648 #04 Y:2026 Direct warmest air to combustion intake $3,734 $11,000
UF0648 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $5,076 $360
UF0648 #02 Y:2026 Use demand controller or load shedder $27,690 $21,590
UF0648 #01 Y:2026 Use solar heat to make electricty $60,816 $375,213
UF0647 #12 Y:2026 Re-arrange equipment layout to reduce labor costs $5,628 $1,368
UF0647 #11 Y:2026 Optimize production lot sizes and inventories $22,000 $4,000
UF0647 #10 Y:2026 Initiate a total quality management program $50,000 $85,000