Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,827

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0624 #08 Y:2024 Level zero – install control systems for existing equipment $23,221 $60,000
UF0624 #07 Y:2024 Replace old machine with new automatic multi-station tool $38,400 $100,000
UF0624 #06 Y:2024 Upgrade controls on compressors $5,844 $6,000
UF0624 #05 Y:2024 Eliminate or reduce compressed air usage $8,280 -
UF0624 #04 Y:2024 Utilize controls to operate equipment only when needed $12,033 $25,340
UF0624 #03 Y:2024 Use battery storage for demand control $11,217 $21,658
UF0624 #02 Y:2024 Use fossil fuel powered generator during peak demand periods $20,908 $14,359
UF0624 #01 Y:2024 Use solar heat to make electricty $59,131 $322,608
UF0623 #08 Y:2024 Replace existing equipment with more suitable substitutes $56,000 $20,720
UF0623 #07 Y:2024 Improve combustion control capability $958 $1,400
UF0623 #06 Y:2024 Install turbulators $979 $3,750
UF0623 #05 Y:2024 Turn off equipment when not in use $1,616 -
UF0623 #04 Y:2024 Install de-aerator in place of condensate tank $2,627 $2,343
UF0623 #03 Y:2024 Replace high resistance ducts, pipes, and fittings $4,089 $5,440
UF0623 #02 Y:2024 Preheat combustion air with waste heat $11,057 $4,000
UF0623 #01 Y:2024 Use demand controller or load shedder $21,088 $3,402
UF0622 #12 Y:2024 Modify facility to avoid excess maintenance costs $3,200 $3,200
UF0622 #11 Y:2024 Improve space comfort conditioning $30,240 $788
UF0622 #10 Y:2024 Level one – add communication using iiot devices to existing control system to modify operations $46,005 -
UF0622 #09 Y:2024 Level zero – install control systems for existing equipment $16,512 $11,225