Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,116

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0654 #07 Y:2026 Improve space comfort conditioning $53,493 $12,420
UF0654 #06 Y:2026 Automate finishing process $120,507 $105,000
UF0654 #05 Y:2026 Minimize condenser cooling water temperature $1,912 $8,477
UF0654 #04 Y:2026 Utilize controls to operate equipment only when needed $7,021 $25,440
UF0654 #03 Y:2026 Use demand controller or load shedder $8,047 $4,580
UF0654 #02 Y:2026 Use / purchase optimum sized compressor $18,934 $52,105
UF0654 #01 Y:2026 Use solar heat to make electricty $83,684 $322,608
UF0653 #08 Y:2026 Install adequate dryers on air lines to eliminate blowdown $3,000 $3,443
UF0653 #07 Y:2026 Re-arrange equipment layout to reduce labor costs $5,627 $1,368
UF0653 #06 Y:2026 Install automatic part storage / retreval system $8,160 $40,000
UF0653 #05 Y:2026 Replace existing equipment with more suitable substitutes $110,880 $740
UF0653 #04 Y:2026 Lower light fixtures in high ceiling areas $2,349 $4,268
UF0653 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,347 $28,316
UF0653 #02 Y:2026 Use demand controller or load shedder $9,772 $6,163
UF0653 #01 Y:2026 Use solar heat to make electricty $109,343 $322,608
UF0650 #09 Y:2026 Replace existing equipment with more suitable substitutes $25,000 $3,560
UF0650 #08 Y:2026 Improve space comfort conditioning $56,488 $22,740
UF0650 #07 Y:2026 Analyze flue gas for proper air/fuel ratio $5,076 -
UF0650 #06 Y:2026 Minimize condenser cooling water temperature $11,638 $28,395
UF0650 #05 Y:2026 Substitute compressed air cooling with water or air cooling $12,689 $2,700