4,888
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UF0630 #12 Y:2025 | 12 | 2025 | Level one – add communication using iiot devices to existing control system to modify operations | $1,323 | - |
n/a
|
UF0630 #11 Y:2025 | 11 | 2025 | Level zero – install control systems for existing equipment | $11,572 | $20,000 |
n/a
|
UF0630 #10 Y:2025 | 10 | 2025 | Turn off equipment when not in use | $625 | $1,750 |
n/a
|
UF0630 #09 Y:2025 | 09 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $958 | - |
n/a
|
UF0630 #08 Y:2025 | 08 | 2025 | Install soft-start to eliminate nuisance trips | $1,256 | $2,120 |
n/a
|
UF0630 #07 Y:2025 | 07 | 2025 | Utilize controls to operate equipment only when needed | $6,407 | $25,400 |
n/a
|
UF0630 #06 Y:2025 | 06 | 2025 | Use most efficient type of electric motors | $9,264 | $14,760 |
n/a
|
UF0630 #05 Y:2025 | 05 | 2025 | Improve combustion control capability | $10,115 | $40,000 |
n/a
|
UF0630 #04 Y:2025 | 04 | 2025 | Improve combustion control capability | $10,115 | $2,000 |
n/a
|
UF0630 #03 Y:2025 | 03 | 2025 | Use demand controller or load shedder | $12,224 | $8,907 |
n/a
|
UF0630 #02 Y:2025 | 02 | 2025 | Keep solid fuels / raw materials dry | $25,034 | $48,000 |
n/a
|
UF0630 #01 Y:2025 | 01 | 2025 | Upgrade controls on compressors | $66,329 | $8,820 |
n/a
|
UF0629 #08 Y:2025 | 08 | 2025 | Install compressor air intakes in coolest locations | $214 | $342 |
n/a
|
UF0629 #07 Y:2025 | 07 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,103 | $455 |
n/a
|
UF0629 #06 Y:2025 | 06 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,163 | - |
n/a
|
UF0629 #05 Y:2025 | 05 | 2025 | Minimize condenser cooling water temperature | $1,706 | $754 |
n/a
|
UF0629 #04 Y:2025 | 04 | 2025 | Utilize controls to operate equipment only when needed | $8,306 | $25,400 |
n/a
|
UF0629 #03 Y:2025 | 03 | 2025 | Replace existing chiller with high efficiency model | $14,977 | $47,000 |
n/a
|
UF0629 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $14,163 | $14,913 |
n/a
|
UF0629 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $42,690 | $322,608 |
n/a
|