Assessment Year | 2025 |
---|---|
Principal Product | Custom Parts Fabrication |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 17 |
Plant Area |
16,858
ft2
|
Annual Production | 72,607
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,584 | 311,680 |
kWh
|
$0.063 |
Electricity Demand | $9,463 | 1,047 |
kW-mo/yr
|
$9.04 |
Electricity Fees | $3,244 | - |
|
- |
Other Gas | $31,521 | 319 |
MMBtu
|
$98.81 |
Other Energy | $42,839 | 2,702 |
MMBtu
|
$15.86 |
TOTAL YEARLY COSTS | $106,651 | |||
RECOMMENDED SAVINGS* | $108,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $45,476 | $12,413 |
$(-575.0)
(-9,126)
kWh
|
$(-381.0)
-
kW-mo/yr
|
- | $46,432 | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $19,463 | $60,000 |
$(-13,140.0)
(-208,571)
kWh
|
$(-10,236.0)
-
kW-mo/yr
|
$42,839
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,705 | $4,689 |
$6,006
95,333
kWh
|
$2,699
-
kW-mo/yr
|
- | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $9,396 | $25,300 |
$2,161
34,296
kWh
|
$2,235
-
kW-mo/yr
|
- | - | $5,000 | |
05 | 2.3191: Use demand controller or load shedder | $2,037 | $1,677 |
$1,375
21,818
kWh
|
$662
-
kW-mo/yr
|
- | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $583 | - |
$583
9,253
kWh
|
- | - | - | - | |
07 | 2.4224: Upgrade controls on compressors | $326 | $1,500 |
$326
5,182
kWh
|
- | - | - | - | |
08 | 4.424: Improve space comfort conditioning | $22,260 | $2,620 |
$(-575.0)
(-9,126)
kWh
|
$(-381.0)
-
kW-mo/yr
|
- | $23,216 | - | |
TOTAL RECOMMENDED | $108,246 | $108,199 |
$(-3,839.0)
(-60,941)
kWh
|
$(-5,402.0)
-
kW-mo/yr
|
$42,839
-
MMBtu
|
$69,648 | $5,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs