ITAC Assessment: GT0129
ITAC logo
ITAC Assessment: GT0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product LEAD
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 25,900
ton
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,845 2,834,994
kWh
Natural Gas $229,246 57,282
MMBtu
Fuel Oil #2 $1,401 196
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $23,148 $15,500 - $23,148
-
MMBtu
02 2.2514: Cover open tanks $55,090 $5,750 - $55,090
-
MMBtu
03 2.4133: Use most efficient type of electric motors $2,398 - $2,398
57,151
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,387 $872 $3,387
80,598
kWh
-
TOTAL RECOMMENDED $84,023 $22,122 $5,785
137,749
kWh
$78,238
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs