ITAC Assessment: OR0300
ITAC logo
ITAC Assessment: OR0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Dehydrated Soup Mix
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 75,000
ft2
Annual Production 1,066
ton
Production Hrs. Annual 3,280
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,053 843,787
kWh
Electricity Demand $15,448 3,492
kW-mo/yr
Electricity Fees $2,476 -
Natural Gas $7,596 1,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,991

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.213: Purchase material from supplier in customized packaging $42,600 - - - - - - $42,600 -
02 4.221: Use only amount of packaging material necessary $400 - - - - - - - $400
03 3.1162: Use less wasteful packaging $4,720 - - - - $(-80.0)
-
lb
- - $4,800
04 3.5314: Use in-process recycling whenever possible $103 - - - - $103
-
lb
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,358 - $810
37,808
kWh
$548
-
kW-mo/yr
- - - - -
06 2.4225: Install common header on compressors $1,105 $120 $658
30,774
kWh
$447
-
kW-mo/yr
- - - - -
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,042 $1,000 $715
33,411
kWh
- - - $27 - $300
08 2.4133: Use most efficient type of electric motors $1,025 $1,767 $594
27,843
kWh
$431
-
kW-mo/yr
- - - - -
09 2.3212: Optimize plant power factor $1,179 $2,200 - - $1,179 - - - -
TOTAL RECOMMENDED $53,532 $5,087 $2,777
129,836
kWh
$1,426
-
kW-mo/yr
$1,179 $23
-
lb
$27 $42,600 $5,500
TOTAL IMPLEMENTED $3,991 $1,887 $2,062
96,425
kWh
$1,426
-
kW-mo/yr
- $103
-
lb
- - $400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs