| Assessment Year | 2025 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $50 M to 100M |
| # of Employees | 90 |
| Plant Area |
1,084,644
ft2
|
| Annual Production | 250,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $33,918 | 572,400 |
kWh
|
$0.059 | |
| Electricity Demand | $29,520 | 3,225 |
kW-mo/yr
|
$9.15 | |
| Electricity Fees | $11,070 | - |
|
- | |
| Natural Gas | $178,222 | 68,580 |
MMBtu
|
$2.60 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,492 | 676 |
Tgal
|
$8.12 | |
| TOTAL YEARLY COSTS | $258,222 | ||||
| RECOMMENDED SAVINGS* | $76,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $42,561 | $322,608 |
$33,772
572,400
kWh
|
$8,789
-
kW-mo/yr
|
- | |
| 02 | 2.7273: Install desiccant humidity control system | $8,823 | $24,000 | - | - |
$8,823
-
MMBtu
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,339 | $26,170 |
$5,339
90,496
kWh
|
- | - | |
| 04 | 2.3191: Use demand controller or load shedder | $4,430 | $3,080 |
$2,364
40,068
kWh
|
$2,066
-
kW-mo/yr
|
- | |
| 05 | 2.1116: Improve combustion control capability | $3,565 | $8,000 | - | - |
$3,565
-
MMBtu
|
|
| 06 | 2.1116: Improve combustion control capability | $3,565 | $2,000 | - | - |
$3,565
-
MMBtu
|
|
| 07 | 2.6231: Utilize controls to operate equipment only when needed | $1,970 | $8,200 |
$1,970
33,393
kWh
|
- | - | |
| 08 | 2.4112: Install soft-start to eliminate nuisance trips | $684 | $2,120 |
$684
11,592
kWh
|
- | - | |
| 09 | 2.6218: Turn off equipment when not in use | $630 | $2,500 |
$630
10,683
kWh
|
- | - | |
| 10 | 4.661: Level zero – install control systems for existing equipment | $4,240 | $15,000 |
$675
11,448
kWh
|
- |
$3,565
-
MMBtu
|
|
| 11 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $505 | - |
$139
2,352
kWh
|
- |
$366
-
MMBtu
|
|
| TOTAL RECOMMENDED | $76,312 | $413,678 |
$45,573
772,432
kWh
|
$10,855
-
kW-mo/yr
|
$19,884
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs