Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 1,084,644
ft2
Annual Production 250,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,918 572,400
kWh
Electricity Demand $29,520 3,225
kW-mo/yr
Electricity Fees $11,070 -
Natural Gas $178,222 68,580
MMBtu
Waste Disposal Costs
Water Usage $5,492 676
Tgal
TOTAL YEARLY COSTS $258,222
RECOMMENDED SAVINGS* $76,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $42,561 $322,608 $33,772
572,400
kWh
$8,789
-
kW-mo/yr
-
02 2.7273: Install desiccant humidity control system $8,823 $24,000 - - $8,823
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,339 $26,170 $5,339
90,496
kWh
- -
04 2.3191: Use demand controller or load shedder $4,430 $3,080 $2,364
40,068
kWh
$2,066
-
kW-mo/yr
-
05 2.1116: Improve combustion control capability $3,565 $8,000 - - $3,565
-
MMBtu
06 2.1116: Improve combustion control capability $3,565 $2,000 - - $3,565
-
MMBtu
07 2.6231: Utilize controls to operate equipment only when needed $1,970 $8,200 $1,970
33,393
kWh
- -
08 2.4112: Install soft-start to eliminate nuisance trips $684 $2,120 $684
11,592
kWh
- -
09 2.6218: Turn off equipment when not in use $630 $2,500 $630
10,683
kWh
- -
10 4.661: Level zero – install control systems for existing equipment $4,240 $15,000 $675
11,448
kWh
- $3,565
-
MMBtu
11 4.662: Level one – add communication using iiot devices to existing control system to modify operations $505 - $139
2,352
kWh
- $366
-
MMBtu
TOTAL RECOMMENDED $76,312 $413,678 $45,573
772,432
kWh
$10,855
-
kW-mo/yr
$19,884
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs