Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,097

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1126 #03 Y:2025 Pay utility bills on time $2,991 -
UD1126 #02 Y:2025 Meter recycled water (to reduce sewer charges) $9,848 $2,500
UD1126 #01 Y:2025 Change rate schedules or other changes in utility service $32,372 -
UD1125 #05 Y:2025 Install occupancy sensors $1,480 $1,208
UD1125 #04 Y:2025 Reduce space conditioning during non-working hours $57,614 $3,735
UD1125 #03 Y:2025 Eliminate or reduce compressed air usage $4,431 -
UD1125 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $20,992 $953
UD1125 #01 Y:2025 Pay utility bills on time $11,153 -
UD1124 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,261 $6,149
UD1124 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $198 $375
UD1124 #03 Y:2025 Use properly designed and sized hvac equipment $9,836 $1,500
UD1124 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $165 -
UD1124 #01 Y:2025 Recharge batteries on during off-peak demand periods $2,950 -
UD1123 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,634 $6,580
UD1123 #03 Y:2025 Install occupancy sensors $757 $247
UD1123 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $5,778 -
UD1123 #01 Y:2025 Use properly designed and sized hvac equipment $7,271 -
UD1118 #07 Y:2025 Install occupancy sensors $186 $153
UD1118 #06 Y:2025 Eliminate leaks in water lines and valves $23,759 $18,000
UD1118 #05 Y:2025 Install compressor air intakes in coolest locations $723 $2,030