Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0257 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,573 $3,100
TT0257 #04 Y:2021 Recover waste heat from equipment $4,957 $12,180
TT0257 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $4,982 $7,100
TT0257 #02 Y:2021 Turn off equipment during breaks, reduce operating time $6,293 -
TT0257 #01 Y:2021 Reduce space conditioning during non-working hours $185,939 $360
TT0255 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $6,140 $7,200
TT0255 #03 Y:2021 Reduce space conditioning during non-working hours $20,336 $24,200
TT0255 #02 Y:2021 Recover waste heat from equipment $32,997 $1,640
TT0255 #01 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $43,816 $1,640
TT0168 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,425 $3,475
TT0168 #03 Y:2016 Insulate bare equipment $3,474 $6,739
TT0168 #02 Y:2016 Reduce the pressure of compressed air to the minimum required $10,532 $100
TT0168 #01 Y:2016 Optimize plant power factor $10,893 $19,250
TT0163 #07 Y:2015 Turn off equipment when not in use $423 $1,500
TT0163 #06 Y:2015 Size electric motors for peak operating efficiency $1,532 $3,013
TT0163 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,611 $3,000
TT0163 #04 Y:2015 Reduce the pressure of compressed air to the minimum required $2,251 $75
TT0163 #03 Y:2015 Turn off equipment when not in use $2,380 $1,075
TT0163 #02 Y:2015 Install occupancy sensors $4,100 $4,110
TT0163 #01 Y:2015 Recover waste heat from equipment $4,742 $5,000