ITAC Assessment: TT0168
ITAC logo
ITAC Assessment: TT0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Brake and Fuel Lines
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 310
Plant Area 206,296
ft2
Annual Production 15,500,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,987 5,538,800
kWh
Electricity Demand $196,263 13,526
kW-mo/yr
Natural Gas $28,158 2,615
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $10,893 $19,250 - $10,893
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $10,532 $100 $7,050
117,494
kWh
$3,482
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $3,474 $6,739 - - $3,474
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,425 $3,475 $1,425
23,751
kWh
- -
TOTAL RECOMMENDED $26,324 $29,564 $8,475
141,245
kWh
$14,375
-
kW-mo/yr
$3,474
-
MMBtu
TOTAL IMPLEMENTED $1,425 $3,475 $1,425
23,751
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs