Assessment Year | 2016 |
---|---|
Principal Product | Brake and Fuel Lines |
NAICS | 336340: Motor Vehicle Brake System Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 310 |
Plant Area |
206,296
ft2
|
Annual Production | 15,500,000
pieces
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $333,987 | 5,538,800 |
kWh
|
$0.060 |
Electricity Demand | $196,263 | 13,526 |
kW-mo/yr
|
$14.51 |
Natural Gas | $28,158 | 2,615 |
MMBtu
|
$10.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,324 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,425 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $10,893 | $19,250 | - |
$10,893
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,532 | $100 |
$7,050
117,494
kWh
|
$3,482
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $3,474 | $6,739 | - | - |
$3,474
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,425 | $3,475 |
$1,425
23,751
kWh
|
- | - | |
TOTAL RECOMMENDED | $26,324 | $29,564 |
$8,475
141,245
kWh
|
$14,375
-
kW-mo/yr
|
$3,474
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,425 | $3,475 |
$1,425
23,751
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs