Assessment Year | 1997 |
---|---|
Principal Product | Produce stamp out metal parts with drop hammer |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 62,000
pieces
|
Production Hrs. Annual | 4,950
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,895 | 344,959 |
kWh
|
$0.084 |
Electricity Demand | $23,808 | 1,934 |
kW-mo/yr
|
$12.31 |
Natural Gas | $67,383 | 15,804 |
MMBtu
|
$4.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $129,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,397 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2515: Use optimum thickness insulation | $11,371 | $2,170 | - | - |
$11,371
-
MMBtu
|
- | - | |
02 | 2.2515: Use optimum thickness insulation | $4,451 | $3,200 | - | - |
$4,451
-
MMBtu
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $1,591 | $1,830 | - | - |
$1,591
-
MMBtu
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $820 | $1,500 |
$446
5,275
kWh
|
$374
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $710 | $2,025 |
$487
5,862
kWh
|
$223
-
kW-mo/yr
|
- | - | - | |
06 | 2.7144: Install spectral reflectors / delamp | $806 | $1,030 |
$535
6,155
kWh
|
$271
-
kW-mo/yr
|
- | - | - | |
07 | 3.7197: Use ultrasonic cleaning | $53,556 | $1,140 | - | - | - |
$53,556
-
gal
|
- | |
08 | 3.8224: Convert to less toxic hydrocarbon cleaners | $53,325 | - | - | - | - |
$53,325
-
gal
|
- | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,900 | $8,500 | - | - | - | - | $2,900 | |
TOTAL RECOMMENDED | $129,530 | $21,395 |
$1,468
17,292
kWh
|
$868
-
kW-mo/yr
|
$17,413
-
MMBtu
|
$106,881
-
gal
|
$2,900 | ||
TOTAL IMPLEMENTED | $108,397 | $4,195 |
$1,022
12,017
kWh
|
$494
-
kW-mo/yr
|
- |
$106,881
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs