ITAC Assessment: SD0185
ITAC logo
ITAC Assessment: SD0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Produce stamp out metal parts with drop hammer
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 62,000
pieces
Production Hrs. Annual 4,950
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,895 344,959
kWh
Electricity Demand $23,808 1,934
kW-mo/yr
Natural Gas $67,383 15,804
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,397

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.2515: Use optimum thickness insulation $11,371 $2,170 - - $11,371
-
MMBtu
- -
02 2.2515: Use optimum thickness insulation $4,451 $3,200 - - $4,451
-
MMBtu
- -
03 2.7261: Install timers and/or thermostats $1,591 $1,830 - - $1,591
-
MMBtu
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $820 $1,500 $446
5,275
kWh
$374
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $710 $2,025 $487
5,862
kWh
$223
-
kW-mo/yr
- - -
06 2.7144: Install spectral reflectors / delamp $806 $1,030 $535
6,155
kWh
$271
-
kW-mo/yr
- - -
07 3.7197: Use ultrasonic cleaning $53,556 $1,140 - - - $53,556
-
gal
-
08 3.8224: Convert to less toxic hydrocarbon cleaners $53,325 - - - - $53,325
-
gal
-
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,900 $8,500 - - - - $2,900
TOTAL RECOMMENDED $129,530 $21,395 $1,468
17,292
kWh
$868
-
kW-mo/yr
$17,413
-
MMBtu
$106,881
-
gal
$2,900
TOTAL IMPLEMENTED $108,397 $4,195 $1,022
12,017
kWh
$494
-
kW-mo/yr
- $106,881
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs