ITAC Assessment: AM0050
ITAC logo
ITAC Assessment: AM0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product TRAVEL TRAILERS
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 1,300
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,321 668,230
kWh
Natural Gas $3,507 757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,609

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,140 $3,750 $1,140
37,808
kWh
02 2.6212: Turn off equipment during breaks, reduce operating time $508 $500 $508
16,706
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $940 $400 $940
31,067
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $50 $44 $50
586
kWh
05 2.7111: Reduce illumination to minimum necessary levels $111 $40 $111
2,345
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $103 $120 $103
1,758
kWh
TOTAL RECOMMENDED $2,852 $4,854 $2,852
90,270
kWh
TOTAL IMPLEMENTED $1,609 $984 $1,609
50,704
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs