TT0331 #08 Y:2025 | 08 | 2025 | Use photocell controls | $290 | $1,300 |
n/a
|
TT0331 #07 Y:2025 | 07 | 2025 | Use solar heat to make electricty | $75,885 | $335,195 |
n/a
|
TT0331 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,685 | $9,000 |
n/a
|
TT0331 #05 Y:2025 | 05 | 2025 | Initiate a program to acquire iso certification | $4,661 | $15,000 |
n/a
|
TT0331 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $256 | $450 |
n/a
|
TT0331 #03 Y:2025 | 03 | 2025 | Recover waste heat from equipment | $2,170 | $3,000 |
n/a
|
TT0331 #02 Y:2025 | 02 | 2025 | Minimize water usage | $1,508 | $400 |
n/a
|
TT0331 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $393 | $60 |
n/a
|
TT0328 #13 Y:2025 | 13 | 2025 | Turn off equipment during breaks, reduce operating time | $306 | $50 |
n/a
|
TT0328 #12 Y:2025 | 12 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,117 | $1,990 |
n/a
|
TT0328 #11 Y:2025 | 11 | 2025 | Use insulation in furnaces to facilitate heating / cooling | $1,157 | $299 |
n/a
|
TT0328 #10 Y:2025 | 10 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,292 | $50 |
n/a
|
TT0328 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $5,237 | $50 |
n/a
|
TT0328 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $13,275 | $56,250 |
n/a
|
TT0328 #07 Y:2025 | 07 | 2025 | Use waste heat from hot flue gases to preheat | $25,908 | $60,000 |
n/a
|
TT0328 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $41,721 | $631,361 |
n/a
|
TT0328 #05 Y:2025 | 05 | 2025 | Replace city water with recycled water via cooling tower | $52,760 | $41,250 |
n/a
|
TT0328 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $81,754 | $144,000 |
n/a
|
TT0328 #03 Y:2025 | 03 | 2025 | Insulate bare equipment | $92,553 | $200,000 |
n/a
|
TT0328 #02 Y:2025 | 02 | 2025 | Adopt in-house material generation | $184,128 | $600,000 |