ITAC Assessment: TT0339
ITAC logo
ITAC Assessment: TT0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Residential vinyl siding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area 270,000
ft2
Annual Production 110,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,264,048 22,605,600
kWh
Electricity Demand $652,739 39,163
kW-mo/yr
Natural Gas $11,073 1,072
MMBtu
Waste Disposal Costs
Water Usage $4,358 1,692
Tgal
Water Disposal $8,509 1,692
Tgal
TOTAL YEARLY COSTS $1,940,727
RECOMMENDED SAVINGS* $3,761,842 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.112: Replace old machine with new automatic multi-station tool $3,565,927 $5,250,000 $291,160
5,199,288
kWh
- - $2,547
-
MMBtu
- $3,272,220
02 2.9113: Use solar heat for heat $49,796 $276,634 $49,796
899,224
kWh
- - - - -
03 4.611: Begin a practice of predictive / preventative maintenance $33,333 $35,000 - - - - $33,333 -
04 2.3212: Optimize plant power factor $31,076 $9,750 - - $31,076 - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $24,795 $10,920 $17,397
310,665
kWh
$7,398
-
kW-mo/yr
- - - -
06 2.6212: Turn off equipment during breaks, reduce operating time $22,030 $20,000 $22,030
393,368
kWh
- - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,876 $5,625 $15,876
283,500
kWh
- - - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,575 $11,250 $11,575
206,700
kWh
- - - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,566 $850 $4,606
82,247
kWh
$1,960
-
kW-mo/yr
- - - -
10 2.7224: Reduce space conditioning during non-working hours $868 $100 $868
15,503
kWh
- - - - -
TOTAL RECOMMENDED $3,761,842 $5,620,129 $413,308
7,390,495
kWh
$9,358
-
kW-mo/yr
$31,076 $2,547
-
MMBtu
$33,333 $3,272,220
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs