233
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TN0676 #08 Y:2000 | 08 | 2000 | Meter waste water | $928 | $2,300 | |
| TN0676 #07 Y:2000 | 07 | 2000 | Install / repair insulation on steam lines | $1,025 | $175 | |
| TN0676 #06 Y:2000 | 06 | 2000 | Shut off air conditioning in winter heating season | $3,095 | $6,250 | |
| TN0676 #05 Y:2000 | 05 | 2000 | Reuse / recycle/ sell paper products | $4,496 | $12,200 | |
| TN0676 #04 Y:2000 | 04 | 2000 | Contract a wood pallet recycling company | $6,144 | $1,200 | |
| TN0676 #03 Y:2000 | 03 | 2000 | Minimize condenser cooling water temperature | $6,275 | $18,200 | |
| TN0676 #02 Y:2000 | 02 | 2000 | Develop standard procedures to improve internal yields | $37,314 | $28,050 | |
| TN0676 #01 Y:2000 | 01 | 2000 | Train operators for maximum operating efficiency | $105,000 | $94,080 | |
| TN0662 #06 Y:1999 | 06 | 1999 | Install equipment (eg compactor) to reduce disposal costs | $970 | $2,225 | |
| TN0662 #05 Y:1999 | 05 | 1999 | Recover waste heat from equipment | $1,010 | $1,460 | |
| TN0662 #04 Y:1999 | 04 | 1999 | Improve air circulation with destratification fans / other methods | $14,050 | $19,800 | |
| TN0662 #03 Y:1999 | 03 | 1999 | Use demand controller or load shedder | $16,380 | $4,260 | |
| TN0662 #02 Y:1999 | 02 | 1999 | Modify current incentive program | $45,000 | $30,000 | |
| TN0662 #01 Y:1999 | 01 | 1999 | Initiate a program to acquire iso certification | $55,900 | $90,000 | |
| TN0660 #06 Y:1999 | 06 | 1999 | Use filter and drying oven to reduce sludge volume | $3,300 | $8,200 | |
| TN0660 #05 Y:1999 | 05 | 1999 | Keep doors and windows shut when not on use | $5,360 | $1,070 | |
| TN0660 #04 Y:1999 | 04 | 1999 | Change procedures / equipment / operating conditions | $5,450 | - | |
| TN0660 #03 Y:1999 | 03 | 1999 | Use demand controller or load shedder | $9,247 | $4,700 | |
| TN0660 #02 Y:1999 | 02 | 1999 | Initiate a program to acquire iso certification | $20,100 | $50,000 | |
| TN0660 #01 Y:1999 | 01 | 1999 | Convert to high volume low pressure (hvlp) paint guns | $56,525 | $880 |