ITAC Assessment: TN0662
ITAC logo
ITAC Assessment: TN0662
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electrolytic capactiors
NAICS
n/a
SIC 3670:
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 110,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,985 6,173,212
kWh
Electricity Demand $156,659 12,567
kW-mo/yr
Electricity Fees $8,793 -
Natural Gas $35,244 6,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Product Savings
01 4.721: Initiate a program to acquire iso certification $55,900 $90,000 - - - - - $55,900
02 4.421: Modify current incentive program $45,000 $30,000 - - - - $(-60,000.0) $105,000
03 2.3191: Use demand controller or load shedder $16,380 $4,260 - $16,380
-
kW-mo/yr
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $14,050 $19,800 $11,580
234,467
kWh
- $2,470
-
MMBtu
- - -
05 2.2437: Recover waste heat from equipment $1,010 $1,460 - - $1,010
-
MMBtu
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $970 $2,225 - - $340
-
MMBtu
$630
-
gal
- -
TOTAL RECOMMENDED $133,310 $147,745 $11,580
234,467
kWh
$16,380
-
kW-mo/yr
$3,820
-
MMBtu
$630
-
gal
$(-60,000.0) $160,900
TOTAL IMPLEMENTED $60,060 $51,260 $11,580
234,467
kWh
- $3,480
-
MMBtu
- $(-60,000.0) $105,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs