Assessment Year | 1999 |
---|---|
Principal Product | Electrolytic capactiors |
NAICS |
n/a
|
SIC | 3670: |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
110,000
ft2
|
Annual Production | 5,500,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,985 | 6,173,212 |
kWh
|
$0.017 |
Electricity Demand | $156,659 | 12,567 |
kW-mo/yr
|
$12.47 |
Electricity Fees | $8,793 | - |
|
- |
Natural Gas | $35,244 | 6,256 |
MMBtu
|
$5.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,060 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.721: Initiate a program to acquire iso certification | $55,900 | $90,000 | - | - | - | - | - | $55,900 | |
02 | 4.421: Modify current incentive program | $45,000 | $30,000 | - | - | - | - | $(-60,000.0) | $105,000 | |
03 | 2.3191: Use demand controller or load shedder | $16,380 | $4,260 | - |
$16,380
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $14,050 | $19,800 |
$11,580
234,467
kWh
|
- |
$2,470
-
MMBtu
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,010 | $1,460 | - | - |
$1,010
-
MMBtu
|
- | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $970 | $2,225 | - | - |
$340
-
MMBtu
|
$630
-
gal
|
- | - | |
TOTAL RECOMMENDED | $133,310 | $147,745 |
$11,580
234,467
kWh
|
$16,380
-
kW-mo/yr
|
$3,820
-
MMBtu
|
$630
-
gal
|
$(-60,000.0) | $160,900 | ||
TOTAL IMPLEMENTED | $60,060 | $51,260 |
$11,580
234,467
kWh
|
- |
$3,480
-
MMBtu
|
- | $(-60,000.0) | $105,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs