Assessment Year | 1992 |
---|---|
Principal Product | SPECIALTY PAPER |
NAICS |
n/a
|
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 122 |
Plant Area |
n/a
|
Annual Production | 12,000
ton
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $639,601 | 8,295,721 |
kWh
|
$0.077 |
Natural Gas | $90,917 | 15,818 |
MMBtu
|
$5.75 |
Fuel Oil #6 | $547,059 | 196,399 |
MMBtu
|
$2.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $146,452 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,256 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $95,745 | $229,893 |
$(-8,023.0)
(-104,045)
kWh
|
$103,768
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,364 | $30,000 | - |
$13,364
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $5,409 | $2,790 | - |
$5,409
-
MMBtu
|
- | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $3,499 | $11,534 | - |
$3,499
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,256 | $36 |
$13,752
178,781
kWh
|
- | $(-496.0) | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,652 | $20,657 |
$7,652
99,062
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,000 | - |
$4,000
51,876
kWh
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,209 | $11,204 |
$3,209
41,618
kWh
|
- | - | |
09 | 2.2122: Install / repair insulation on condensate lines | $318 | $740 | - |
$318
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $146,452 | $306,854 |
$20,590
267,292
kWh
|
$126,358
-
MMBtu
|
$(-496.0) | ||
TOTAL IMPLEMENTED | $17,256 | $36 |
$17,752
230,657
kWh
|
- | $(-496.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs