Assessment Year | 2000 |
---|---|
Principal Product | Extruded plastic film |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 215 |
Plant Area |
160,000
ft2
|
Annual Production | 63,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $688,378 | 18,538,101 |
kWh
|
$0.037 |
Electricity Demand | $263,532 | 28,269 |
kW-mo/yr
|
$9.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $164,277 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,891 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.431: Train operators for maximum operating efficiency | $105,000 | $94,080 | - | - | - | $105,000 | |
02 | 4.122: Develop standard procedures to improve internal yields | $37,314 | $28,050 |
$34,200
777,257
kWh
|
- | - | $3,114 | |
03 | 2.2623: Minimize condenser cooling water temperature | $6,275 | $18,200 |
$6,275
119,578
kWh
|
- | - | - | |
04 | 3.5316: Contract a wood pallet recycling company | $6,144 | $1,200 | - | - |
$6,144
-
lb
|
- | |
05 | 3.5217: Reuse / recycle/ sell paper products | $4,496 | $12,200 | - | - |
$4,290
-
lb
|
$206 | |
06 | 2.6215: Shut off air conditioning in winter heating season | $3,095 | $6,250 |
$3,095
70,340
kWh
|
- | - | - | |
07 | 2.2136: Install / repair insulation on steam lines | $1,025 | $175 |
$709
16,120
kWh
|
$316
-
kW-mo/yr
|
- | - | |
08 | 3.4155: Meter waste water | $928 | $2,300 | - | - | - | $928 | |
TOTAL RECOMMENDED | $164,277 | $162,455 |
$44,279
983,295
kWh
|
$316
-
kW-mo/yr
|
$10,434
-
lb
|
$109,248 | ||
TOTAL IMPLEMENTED | $14,891 | $36,825 |
$10,079
206,038
kWh
|
$316
-
kW-mo/yr
|
$4,290
-
lb
|
$206 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs