ITAC Assessment: UMS011
ITAC logo
ITAC Assessment: UMS011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Ethanol
NAICS 325193: Ethyl Alcohol Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 10,000
Tgal
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,300,000 30,000,000
kWh
Natural Gas $7,000,000 1,400,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,948,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,224,000 $1,300,000 $1,224,000
20,610,000
kWh
-
02 2.2437: Recover waste heat from equipment $275,000 $500,000 - $275,000
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $196,000 $300,000 - $196,000
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $113,000 $70,000 - $113,000
-
MMBtu
05 2.2424: Use heat in flue gases to preheat products or materials $100,000 $200,000 - $100,000
-
MMBtu
06 2.2511: Insulate bare equipment $40,000 $40,000 - $40,000
-
MMBtu
TOTAL RECOMMENDED $1,948,000 $2,410,000 $1,224,000
20,610,000
kWh
$724,000
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs