| Assessment Year | 1995 |
|---|---|
| Principal Product | Finished vessel flanges |
| NAICS |
n/a
|
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 132 |
| Plant Area |
50,250
ft2
|
| Annual Production | 240,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,512 | 1,761,430 |
kWh
|
$0.087 |
| Natural Gas | $5,469 | 1,121 |
MMBtu
|
$4.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,470 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $14,700 | $22,050 |
$14,700
-
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,320 | $1,580 |
$6,320
116,940
kWh
|
- | |
| 03 | 2.7145: Install skylights | $900 | $470 |
$900
16,706
kWh
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $890 | $280 |
$250
5,569
kWh
|
$640
-
MMBtu
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $730 | - |
$730
13,482
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $690 | $610 |
$690
9,379
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $510 | $320 |
$510
5,275
kWh
|
- | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $400 | - |
$400
7,327
kWh
|
- | |
| 09 | 2.7124: Make a practice of turning off lights when not needed | $320 | - |
$320
3,810
kWh
|
- | |
| TOTAL RECOMMENDED | $25,460 | $25,310 |
$24,820
178,488
kWh
|
$640
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,470 | $2,980 |
$9,470
165,592
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs