ITAC Assessment: TN0660
ITAC logo
ITAC Assessment: TN0660
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Positive displacement pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 85,000
ft2
Annual Production 2,100
pieces
Production Hrs. Annual 3,060
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,969 6,447,831
kWh
Electricity Demand $92,622 27,162
kW-mo/yr
Electricity Fees $192 -
Natural Gas $75,248 13,360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $56,525 $880 - - - $56,525 - -
02 4.721: Initiate a program to acquire iso certification $20,100 $50,000 - - - - - $20,100
03 2.3191: Use demand controller or load shedder $9,247 $4,700 - $9,247
-
kW-mo/yr
- - - -
04 3.1191: Change procedures / equipment / operating conditions $5,450 - - - - - $5,450 -
05 2.7442: Keep doors and windows shut when not on use $5,360 $1,070 $5,360
148,886
kWh
- - - - -
06 3.6112: Use filter and drying oven to reduce sludge volume $3,300 $8,200 $(-60.0)
(-2,931)
kWh
- $3,360
-
gal
- - -
TOTAL RECOMMENDED $99,982 $64,850 $5,300
145,955
kWh
$9,247
-
kW-mo/yr
$3,360
-
gal
$56,525 $5,450 $20,100
TOTAL IMPLEMENTED $94,532 $64,850 $5,300
145,955
kWh
$9,247
-
kW-mo/yr
$3,360
-
gal
$56,525 - $20,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs