| Assessment Year | 1999 |
|---|---|
| Principal Product | Positive displacement pumps |
| NAICS |
n/a
|
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
85,000
ft2
|
| Annual Production | 2,100
pieces
|
| Production Hrs. Annual | 3,060
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $233,969 | 6,447,831 |
kWh
|
$0.036 |
| Electricity Demand | $92,622 | 27,162 |
kW-mo/yr
|
$3.41 |
| Electricity Fees | $192 | - |
|
- |
| Natural Gas | $75,248 | 13,360 |
MMBtu
|
$5.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $99,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $94,532 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $56,525 | $880 | - | - | - | $56,525 | - | - | |
| 02 | 4.721: Initiate a program to acquire iso certification | $20,100 | $50,000 | - | - | - | - | - | $20,100 | |
| 03 | 2.3191: Use demand controller or load shedder | $9,247 | $4,700 | - |
$9,247
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 3.1191: Change procedures / equipment / operating conditions | $5,450 | - | - | - | - | - | $5,450 | - | |
| 05 | 2.7442: Keep doors and windows shut when not on use | $5,360 | $1,070 |
$5,360
148,886
kWh
|
- | - | - | - | - | |
| 06 | 3.6112: Use filter and drying oven to reduce sludge volume | $3,300 | $8,200 |
$(-60.0)
(-2,931)
kWh
|
- |
$3,360
-
gal
|
- | - | - | |
| TOTAL RECOMMENDED | $99,982 | $64,850 |
$5,300
145,955
kWh
|
$9,247
-
kW-mo/yr
|
$3,360
-
gal
|
$56,525 | $5,450 | $20,100 | ||
| TOTAL IMPLEMENTED | $94,532 | $64,850 |
$5,300
145,955
kWh
|
$9,247
-
kW-mo/yr
|
$3,360
-
gal
|
$56,525 | - | $20,100 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs