Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,118

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0476 #04 Y:2004 Use or replace with energy efficient substitutes $32,100 $47,900
OR0476 #03 Y:2004 Establish burner maintenance schedule for boilers $9,028 $600
OR0476 #02 Y:2004 Replace existing equipment with more suitable substitutes $1,039,000 $1,200,000
OR0476 #01 Y:2004 Install sensors to detect defects $59,097 $38,400
OR0475 #06 Y:2004 Make a practice of turning off lights when not needed $3,920 -
OR0475 #05 Y:2004 Turn off equipment during breaks, reduce operating time $920 -
OR0475 #04 Y:2004 Modify refrigeration system to operate at a lower pressure $9,700 -
OR0475 #03 Y:2004 Modify refrigeration system to operate at a lower pressure $3,300 -
OR0475 #02 Y:2004 Avoid frost formation on evaporators $6,600 $1,500
OR0475 #01 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $3,030 $6,920
OR0474 #06 Y:2004 Modify refrigeration system to operate at a lower pressure $6,200 $1,500
OR0474 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,910 $3,000
OR0474 #04 Y:2004 Use most efficient type of electric motors $4,700 $5,900
OR0474 #03 Y:2004 Install / repair insulation on steam lines $2,700 $2,030
OR0474 #02 Y:2004 Increase amount of condensate returned $9,900 $2,770
OR0474 #01 Y:2004 Increase amount of condensate returned $8,887 $4,500
OR0473 #05 Y:2004 Upgrade controls on compressors $1,100 $4,000
OR0473 #04 Y:2004 Utilize controls to operate equipment only when needed $1,530 $2,200
OR0473 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,500 $1,500