Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0796 #04 Y:2024 Use solar heat to make electricty $130,526 $1,312,500
OR0796 #03 Y:2024 Install adequate dryers on air lines to eliminate blowdown $584 $2,239
OR0796 #02 Y:2024 Adopt in-house material generation $86,946 $168,430
OR0796 #01 Y:2024 Install / repair insulation on steam lines $733 $546
OR0525 #05 Y:2007 Not found $1,300 $1,900
OR0525 #04 Y:2007 Not found $2,900 $6,400
OR0525 #03 Y:2007 Not found $5,000 $25,000
OR0525 #02 Y:2007 Not found $19,700 -
OR0525 #01 Y:2007 Not found $246,000 $900,000
OR0524 #07 Y:2007 Optimize plant power factor $13,800 $19,200
OR0524 #06 Y:2007 Make a practice of turning off lights when not needed $1,800 $1,300
OR0524 #05 Y:2007 Utilize energy-efficient belts and other improved mechanisms $1,000 -
OR0524 #04 Y:2007 Eliminate or reduce compressed air usage $2,100 -
OR0524 #03 Y:2007 Upgrade controls on compressors $13,700 $35,000
OR0524 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $2,300 $3,500
OR0524 #01 Y:2007 Develop standard procedures to improve internal yields $489,500 $250,000
OR0523 #05 Y:2007 Cover open tanks $3,000 $9,000
OR0523 #04 Y:2007 Insulate bare equipment $1,220 $1,160
OR0523 #03 Y:2007 Change procedures / equipment / operating conditions $1,350,000 $32,700
OR0523 #02 Y:2007 Preheat boiler makeup water with waste process heat $77,000 $5,000