116
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0796 #04 Y:2024 | 04 | 2024 | Use solar heat to make electricty | $130,526 | $1,312,500 | |
| OR0796 #03 Y:2024 | 03 | 2024 | Install adequate dryers on air lines to eliminate blowdown | $584 | $2,239 | |
| OR0796 #02 Y:2024 | 02 | 2024 | Adopt in-house material generation | $86,946 | $168,430 | |
| OR0796 #01 Y:2024 | 01 | 2024 | Install / repair insulation on steam lines | $733 | $546 | |
| OR0525 #05 Y:2007 | 05 | 2007 | Not found | $1,300 | $1,900 | |
| OR0525 #04 Y:2007 | 04 | 2007 | Not found | $2,900 | $6,400 | |
| OR0525 #03 Y:2007 | 03 | 2007 | Not found | $5,000 | $25,000 | |
| OR0525 #02 Y:2007 | 02 | 2007 | Not found | $19,700 | - | |
| OR0525 #01 Y:2007 | 01 | 2007 | Not found | $246,000 | $900,000 | |
| OR0524 #07 Y:2007 | 07 | 2007 | Optimize plant power factor | $13,800 | $19,200 | |
| OR0524 #06 Y:2007 | 06 | 2007 | Make a practice of turning off lights when not needed | $1,800 | $1,300 | |
| OR0524 #05 Y:2007 | 05 | 2007 | Utilize energy-efficient belts and other improved mechanisms | $1,000 | - | |
| OR0524 #04 Y:2007 | 04 | 2007 | Eliminate or reduce compressed air usage | $2,100 | - | |
| OR0524 #03 Y:2007 | 03 | 2007 | Upgrade controls on compressors | $13,700 | $35,000 | |
| OR0524 #02 Y:2007 | 02 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,300 | $3,500 | |
| OR0524 #01 Y:2007 | 01 | 2007 | Develop standard procedures to improve internal yields | $489,500 | $250,000 | |
| OR0523 #05 Y:2007 | 05 | 2007 | Cover open tanks | $3,000 | $9,000 | |
| OR0523 #04 Y:2007 | 04 | 2007 | Insulate bare equipment | $1,220 | $1,160 | |
| OR0523 #03 Y:2007 | 03 | 2007 | Change procedures / equipment / operating conditions | $1,350,000 | $32,700 | |
| OR0523 #02 Y:2007 | 02 | 2007 | Preheat boiler makeup water with waste process heat | $77,000 | $5,000 |