ITAC Assessment: OR0524
ITAC logo
ITAC Assessment: OR0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product dimensional lumber
NAICS 333243: Sawmill, Woodworking, and Paper Machinery Manufacturing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area 35,000
ft2
Annual Production 45,000
thousand feet
Production Hrs. Annual 2,205
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,700 3,457,000
kWh
Electricity Demand $15,400 87,700
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $524,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $507,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Increase in Production Savings
01 4.122: Develop standard procedures to improve internal yields $489,500 $250,000 - - $489,500
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,300 $3,500 $2,300
45,000
kWh
- -
03 2.4224: Upgrade controls on compressors $13,700 $35,000 $13,700
302,000
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $2,100 - $2,100
32,000
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,000 - $1,000
9,740
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $1,800 $1,300 $1,800
45,990
kWh
- -
07 2.3212: Optimize plant power factor $13,800 $19,200 - $13,800 -
TOTAL RECOMMENDED $524,200 $309,000 $20,900
434,730
kWh
$13,800 $489,500
TOTAL IMPLEMENTED $507,600 $288,500 $18,100
379,000
kWh
- $489,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs