ITAC Assessment: MS0322
ITAC logo
ITAC Assessment: MS0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Tires
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range $50
M
to 100
M
# of Employees 1,750
Plant Area 1,700,000
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,563,617 126,518,370
kWh
Electricity Demand $2,057,874 203,013
kW-mo/yr
Electricity Fees $14,101 -
Natural Gas $4,776,784 589,976
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $777,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $573,726 $6,271,690 $2,537,312
91,566,674
kWh
$1,254,340
-
kW-mo/yr
$57 $(-3,217,983.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $180,588 $443,666 $120,848
4,361,153
kWh
$59,740
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,977 $662 $9,977
441,103
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,530 $4,972 $9,530
343,918
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,921 $17,102 $1,351
48,759
kWh
$1,570
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $979 $480 $599
21,625
kWh
$380
-
kW-mo/yr
- -
TOTAL RECOMMENDED $777,721 $6,738,572 $2,679,617
96,783,232
kWh
$1,316,030
-
kW-mo/yr
$57 $(-3,217,983.0)
-
MMBtu
TOTAL IMPLEMENTED $10,956 $1,142 $10,576
462,728
kWh
$380
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs