ITAC Assessment: OK0066
ITAC logo
ITAC Assessment: OK0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product INJECTION-MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,179 785,463
kWh
Natural Gas $1,550 457
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,042

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,410 $9,010 $2,410
87,046
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $973 $633 $973
35,170
kWh
-
03 2.3191: Use demand controller or load shedder $718 $433 $718
-
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,042 - $1,042
37,808
kWh
-
05 2.3212: Optimize plant power factor $1,504 $1,520 $1,504
-
kWh
-
06 2.4322: Use or replace with energy efficient substitutes $56 $114 $56
2,052
kWh
-
07 2.7226: Use computer programs to optimize hvac performance $5,173 $24,000 $5,173
186,987
kWh
-
08 2.7261: Install timers and/or thermostats $69 $296 - $69
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $263 $95 $263
7,327
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $36 $38 $36
879
kWh
-
TOTAL RECOMMENDED $12,244 $36,139 $12,175
357,269
kWh
$69
-
MMBtu
TOTAL IMPLEMENTED $1,042 $929 $973
35,170
kWh
$69
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs