ITAC Assessment: OR0523
ITAC logo
ITAC Assessment: OR0523
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Ammunition
NAICS 332993: Ammunition (except Small Arms) Manufacturing
SIC 3483: Ammunition, Except for Small Arms
Sales Range $100
M
to 500
M
# of Employees 932
Plant Area 317,940
ft2
Annual Production 70,500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $872,043 25,258,187
kWh
Electricity Demand $101,740 37,708
kW-mo/yr
Natural Gas $363,044 37,743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,466,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings Increase in Production Savings
01 3.1191: Change procedures / equipment / operating conditions $35,000 $60,000 - - $35,000 -
02 2.2441: Preheat boiler makeup water with waste process heat $77,000 $5,000 - $77,000
-
MMBtu
- -
03 3.1191: Change procedures / equipment / operating conditions $1,350,000 $32,700 - - - $1,350,000
04 2.2511: Insulate bare equipment $1,220 $1,160 - $1,220
-
MMBtu
- -
05 2.2514: Cover open tanks $3,000 $9,000 $3,000
84,900
kWh
- - -
TOTAL RECOMMENDED $1,466,220 $107,860 $3,000
84,900
kWh
$78,220
-
MMBtu
$35,000 $1,350,000
TOTAL IMPLEMENTED $36,220 $61,160 - $1,220
-
MMBtu
$35,000 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs