ITAC Assessment: DS0058
ITAC logo
ITAC Assessment: DS0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cameras & Printers
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 55,000
ft2
Annual Production 1,250
pieces
Production Hrs. Annual 4,394
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,528 622,509
kWh
Electricity Demand $17,426 2,304
kW-mo/yr
Electricity Fees $1,063 -
Natural Gas $24,750 5,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $859 $859 $460
14,654
kWh
$399
-
kW-mo/yr
- - -
02 3.1191: Change procedures / equipment / operating conditions $638 $175 - - - - $638
03 2.7135: Install occupancy sensors $164 $100 $164
4,982
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,728 $300 $1,775
56,565
kWh
$953
-
kW-mo/yr
- - -
05 3.4113: Treat and reuse rinse waters $733 $380 - - - $733
-
Tgal
-
06 2.7224: Reduce space conditioning during non-working hours $1,885 $1,050 - - $1,885
-
MMBtu
- -
TOTAL RECOMMENDED $7,007 $2,864 $2,399
76,201
kWh
$1,352
-
kW-mo/yr
$1,885
-
MMBtu
$733
-
Tgal
$638
TOTAL IMPLEMENTED $6,110 $2,384 $2,235
71,219
kWh
$1,352
-
kW-mo/yr
$1,885
-
MMBtu
- $638
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs