ITAC Assessment: ST0003
ITAC logo
ITAC Assessment: ST0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CONTROL VALVES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area
n/a
Annual Production 4,500,000
pieces
Production Hrs. Annual 2,850
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,734 351,407
kWh
Natural Gas $14,051 2,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,796

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,925 $372 $1,925
19,050
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,227 $24 $1,227
12,016
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,017 $537 - $1,017
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $786 $2,035 $(-197.0)
(-2,052)
kWh
$983
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $156 - $107
1,172
kWh
$49
-
MMBtu
06 2.1123: Install automatic stack damper $1,004 $940 - $1,004
-
MMBtu
07 2.7494: Install storm windows and doors $668 $209 - $668
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $447 - $447
4,396
kWh
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $681 $436 - $681
-
MMBtu
TOTAL RECOMMENDED $7,911 $4,553 $3,509
34,582
kWh
$4,402
-
MMBtu
TOTAL IMPLEMENTED $6,796 $4,344 $3,062
30,186
kWh
$3,734
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs