Assessment Year | 1984 |
---|---|
Principal Product | CONTROL VALVES |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 54 |
Plant Area |
n/a
|
Annual Production | 4,500,000
pieces
|
Production Hrs. Annual | 2,850
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,734 | 351,407 |
kWh
|
$0.10 |
Natural Gas | $14,051 | 2,210 |
MMBtu
|
$6.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,911 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,796 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,925 | $372 |
$1,925
19,050
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,227 | $24 |
$1,227
12,016
kWh
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,017 | $537 | - |
$1,017
-
MMBtu
|
|
04 | 2.7243: Improve air circulation with destratification fans / other methods | $786 | $2,035 |
$(-197.0)
(-2,052)
kWh
|
$983
-
MMBtu
|
|
05 | 2.6121: Reduce hot water temperature to the minimum required | $156 | - |
$107
1,172
kWh
|
$49
-
MMBtu
|
|
06 | 2.1123: Install automatic stack damper | $1,004 | $940 | - |
$1,004
-
MMBtu
|
|
07 | 2.7494: Install storm windows and doors | $668 | $209 | - |
$668
-
MMBtu
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $447 | - |
$447
4,396
kWh
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $681 | $436 | - |
$681
-
MMBtu
|
|
TOTAL RECOMMENDED | $7,911 | $4,553 |
$3,509
34,582
kWh
|
$4,402
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,796 | $4,344 |
$3,062
30,186
kWh
|
$3,734
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs