ITAC Assessment: RU0016
ITAC logo
ITAC Assessment: RU0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BURK CHOCOLATE
NAICS
n/a
SIC 2066: Chocolate and Cocoa Products
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area
n/a
Annual Production 45,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $464,774 6,084,115
kWh
Natural Gas $22,480 4,166
MMBtu
Fuel Oil #2 $93,954 24,458
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $22,305 $15,000 $22,305
291,911
kWh
- -
02 2.4312: Improve lubrication practices $3,367 $1,600 $3,367
43,962
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,922 $1,150 $2,922
38,101
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $828 $500 - $828
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $999 $2,000 - $59
-
MMBtu
$940
-
MMBtu
TOTAL RECOMMENDED $30,421 $20,250 $28,594
373,974
kWh
$887
-
MMBtu
$940
-
MMBtu
TOTAL IMPLEMENTED $30,421 $20,250 $28,594
373,974
kWh
$887
-
MMBtu
$940
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs