ITAC Assessment: HO0235
ITAC logo
ITAC Assessment: HO0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Milk
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 653,000
ft2
Annual Production 41,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,330 3,644,490
kWh
Electricity Demand $182,465 15,658
kW-mo/yr
Electricity Fees $28,681 -
Natural Gas $659,008 109,103
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,960 $11,729 $4,113
106,975
kWh
$1,847
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,410 $15 $5,233
135,991
kWh
$2,177
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,255 $600 $4,255
110,492
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $12,126 $5,000 $8,570
222,743
kWh
$3,556
-
kW-mo/yr
- -
05 2.3511: Use plant owned transformers or lease transformers $34,444 $20,000 - - - $34,444
06 2.8112: Combine utility meters $4,142 $6,000 - $4,142
-
kW-mo/yr
- -
07 4.611: Begin a practice of predictive / preventative maintenance $115,354 $4,000 - - - $115,354
08 4.424: Improve space comfort conditioning $4,200 $375 - - - $4,200
09 3.4156: Use flow control valves on equipment to optimize water use $524 $2,500 - - $524
-
Tgal
-
TOTAL RECOMMENDED $188,415 $50,219 $22,171
576,201
kWh
$11,722
-
kW-mo/yr
$524
-
Tgal
$153,998
TOTAL IMPLEMENTED $55,549 $28,475 $12,825
333,235
kWh
$3,556
-
kW-mo/yr
$524
-
Tgal
$38,644
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs