| Assessment Year | 2000 |
|---|---|
| Principal Product | Milk |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $50 M to 100M |
| # of Employees | 190 |
| Plant Area |
653,000
ft2
|
| Annual Production | 41,000
Tgal
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $140,330 | 3,644,490 |
kWh
|
$0.039 |
| Electricity Demand | $182,465 | 15,658 |
kW-mo/yr
|
$11.65 |
| Electricity Fees | $28,681 | - |
|
- |
| Natural Gas | $659,008 | 109,103 |
MMBtu
|
$6.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $188,415 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $55,549 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,960 | $11,729 |
$4,113
106,975
kWh
|
$1,847
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,410 | $15 |
$5,233
135,991
kWh
|
$2,177
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,255 | $600 |
$4,255
110,492
kWh
|
- | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $12,126 | $5,000 |
$8,570
222,743
kWh
|
$3,556
-
kW-mo/yr
|
- | - | |
| 05 | 2.3511: Use plant owned transformers or lease transformers | $34,444 | $20,000 | - | - | - | $34,444 | |
| 06 | 2.8112: Combine utility meters | $4,142 | $6,000 | - |
$4,142
-
kW-mo/yr
|
- | - | |
| 07 | 4.611: Begin a practice of predictive / preventative maintenance | $115,354 | $4,000 | - | - | - | $115,354 | |
| 08 | 4.424: Improve space comfort conditioning | $4,200 | $375 | - | - | - | $4,200 | |
| 09 | 3.4156: Use flow control valves on equipment to optimize water use | $524 | $2,500 | - | - |
$524
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $188,415 | $50,219 |
$22,171
576,201
kWh
|
$11,722
-
kW-mo/yr
|
$524
-
Tgal
|
$153,998 | ||
| TOTAL IMPLEMENTED | $55,549 | $28,475 |
$12,825
333,235
kWh
|
$3,556
-
kW-mo/yr
|
$524
-
Tgal
|
$38,644 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs