ITAC Assessment: MA0403
ITAC logo
ITAC Assessment: MA0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product monofilament
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 87,000
ft2
Annual Production 3,000,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $594,410 9,427,609
kWh
Electricity Demand $201,096 15,102
kW-mo/yr
Natural Gas $39,698 4,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $57,769 $221,193 $57,529
910,903
kWh
$17,716
-
kW-mo/yr
$(-17,476.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,467 $41,542 $14,104
223,329
kWh
$4,363
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $7,904 $4,620 $7,904
125,147
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,578 $19,800 - $7,548
-
kW-mo/yr
$(-2,970.0)
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,118 $5,000 $2,610
41,325
kWh
$812
-
kW-mo/yr
$(-1,304.0)
-
MMBtu
06 2.4131: Size electric motors for peak operating efficiency $970 $900 $740
11,723
kWh
$230
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $278 - $278
4,396
kWh
- -
TOTAL RECOMMENDED $92,084 $293,055 $83,165
1,316,823
kWh
$30,669
-
kW-mo/yr
$(-21,750.0)
-
MMBtu
TOTAL IMPLEMENTED $26,371 $46,162 $22,008
348,476
kWh
$4,363
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs