Assessment Year | 2018 |
---|---|
Principal Product | Shock Absorbers |
NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
400,000
ft2
|
Annual Production | 7,500,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,571,566 | 25,204,206 |
kWh
|
$0.062 | |
Electricity Demand | $17,263 | 2,877 |
kW-mo/yr
|
$6.00 | |
Natural Gas | $486,187 | 114,226 |
MMBtu
|
$4.26 | |
Waste Disposal Costs | |||||
Water Usage | $163,048 | 69,004,200 |
Tgal
|
$0.002 | |
TOTAL YEARLY COSTS | $2,238,064 | ||||
RECOMMENDED SAVINGS* | $166,921 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $68,074 | $111,703 |
$59,744
957,442
kWh
|
$8,330
-
kW-mo/yr
|
- | - | |
02 | 2.2421: Install waste heat boiler to provide direct power | $47,531 | $15,500 | - | - |
$47,531
-
MMBtu
|
- | |
03 | 3.4159: Replace treated water with well / surface water | $25,853 | $4,700 | - | - | - |
$25,853
-
Tgal
|
|
04 | 2.1221: Replace obsolete burners with more efficient ones | $13,900 | $22,500 | - | - |
$13,900
-
MMBtu
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,775 | $4,800 |
$8,637
138,408
kWh
|
$1,138
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,788 | $2,080 |
$1,580
25,316
kWh
|
$208
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $166,921 | $161,283 |
$69,961
1,121,166
kWh
|
$9,676
-
kW-mo/yr
|
$61,431
-
MMBtu
|
$25,853
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs