Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,028

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ORC019 #04 Y:2025 Use or replace with energy efficient substitutes $1,275 $10,287
ORC019 #03 Y:2025 Use optimum thickness insulation $1,056 $1,496
ORC019 #02 Y:2025 Use most efficient type of electric motors $1,063 $1,700
ORC019 #01 Y:2025 Ventilation system to shut off when room is not in use $272 $1,750
OR0821 #05 Y:2025 Install timers on light switches in little used areas $3,444 $16,650
OR0821 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $10,035 $1,456
OR0821 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $11,774 $3,661
OR0821 #02 Y:2025 Eliminate or reduce compressed air usage $14,423 -
OR0821 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $19,865 -
OR0820 #04 Y:2025 Redesign flow to minimize mass transfer length $12,313 $175,000
OR0820 #03 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $2,066 $629
OR0820 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,677 $982
OR0820 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,825 $10,263
OR0819 #03 Y:2025 Use solar heat to make electricty $4,398 $71,252
OR0819 #02 Y:2025 Use optimum thickness insulation $1,005 $9,448
OR0819 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,460 $11,702
OR0818 #03 Y:2025 Use solar heat to make electricty $29,217 $602,300
OR0818 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $1,920 -
OR0818 #01 Y:2025 Eliminate or reduce compressed air usage $7,742 $1,573
OR0817 #03 Y:2025 Use solar heat to make electricty $42,138 $218,000