Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0215 #05 Y:1991 Re-size charging openings or add movable cover or door $2,255 $202
MA0215 #04 Y:1991 Install set-back timers $1,730 $473
MA0215 #03 Y:1991 Install timers and/or thermostats $7,155 $5,000
MA0215 #02 Y:1991 Use waste heat from hot flue gases to generate steam $13,224 $47,000
MA0215 #01 Y:1991 Repair or replace steam traps $4,234 -
MA0213 #08 Y:1991 Utilize higher efficiency lamps and/or ballasts $10,983 -
MA0213 #07 Y:1991 Utilize energy-efficient belts and other improved mechanisms $4,097 -
MA0213 #06 Y:1991 Install compressor air intakes in coolest locations $1,024 $241
MA0213 #05 Y:1991 Convert combustion equipment to burn natural gas $11,500 -
MA0213 #04 Y:1991 Recover waste heat from equipment $911 $485
MA0213 #03 Y:1991 Install timers and/or thermostats $246 $212
MA0213 #02 Y:1991 Repair or replace steam traps $2,582 -
MA0213 #01 Y:1991 Air condition only space necessary $2,708 $7,000
MA0212 #09 Y:1991 Optimize plant power factor $6,858 -
MA0212 #07 Y:1991 Use most efficient type of electric motors $14,146 $79,350
MA0212 #06 Y:1991 Install set-back timers $393 $161
MA0212 #05 Y:1991 Reduce illumination to minimum necessary levels $4,665 $5,000
MA0212 #04 Y:1991 Disconnect ballasts $1,580 $1,875
MA0212 #03 Y:1991 Use adjustable frequency drive or multiple speed motors on existing system $7,737 $9,055
MA0212 #02 Y:1991 Insulate bare equipment $3,090 $3,593