ITAC Assessment: MA0215
ITAC logo
ITAC Assessment: MA0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product LAMINATED & COATED PAPER
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 189
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,095 2,397,128
kWh
Natural Gas $106,842 15,887
MMBtu
Other Energy $95,661 11,119
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,402 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.2113: Repair or replace steam traps $4,234 - - - $6,734
-
MMBtu
$(-2,500.0)
02 2.2422: Use waste heat from hot flue gases to generate steam $13,224 $47,000 - $13,224
-
MMBtu
- -
03 2.7261: Install timers and/or thermostats $7,155 $5,000 - - $7,155
-
MMBtu
-
04 2.6232: Install set-back timers $1,730 $473 $1,730
20,516
kWh
- - -
05 2.2531: Re-size charging openings or add movable cover or door $2,255 $202 - $2,255
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $346 $193 $346
4,103
kWh
- - -
07 2.2422: Use waste heat from hot flue gases to generate steam $28,458 $24,853 $(-346.0)
(-4,103)
kWh
$28,804
-
MMBtu
- -
TOTAL RECOMMENDED $57,402 $77,721 $1,730
20,516
kWh
$44,283
-
MMBtu
$13,889
-
MMBtu
$(-2,500.0)
TOTAL IMPLEMENTED $57,402 $77,721 $1,730
20,516
kWh
$44,283
-
MMBtu
$13,889
-
MMBtu
$(-2,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs