Assessment Year | 1991 |
---|---|
Principal Product | STAINLESS STEEL WIRE |
NAICS |
n/a
|
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 122 |
Plant Area |
n/a
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $510,606 | 5,990,621 |
kWh
|
$0.085 |
Natural Gas | $34,314 | 5,438 |
MMBtu
|
$6.31 |
Fuel Oil #6 | $28,927 | 6,954 |
MMBtu
|
$4.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,051 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7229: Air condition only space necessary | $2,708 | $7,000 | - | - |
$2,708
-
MMBtu
|
- | |
02 | 2.2113: Repair or replace steam traps | $2,582 | - |
$2,773
32,532
kWh
|
- |
$2,309
-
MMBtu
|
$(-2,500.0) | |
03 | 2.7261: Install timers and/or thermostats | $246 | $212 |
$25
293
kWh
|
$221
-
MMBtu
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $911 | $485 |
$(-75.0)
(-879)
kWh
|
- |
$986
-
MMBtu
|
- | |
05 | 2.1332: Convert combustion equipment to burn natural gas | $11,500 | - |
$16,062
188,453
kWh
|
$(-4,562.0)
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,024 | $241 |
$1,024
12,016
kWh
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,097 | - |
$4,097
48,066
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,983 | - |
$11,016
129,250
kWh
|
- | - | $(-33.0) | |
TOTAL RECOMMENDED | $34,051 | $7,938 |
$34,922
409,731
kWh
|
$(-4,341.0)
-
MMBtu
|
$6,003
-
MMBtu
|
$(-2,533.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs