ITAC Assessment: MA0213
ITAC logo
ITAC Assessment: MA0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STAINLESS STEEL WIRE
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 122
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $510,606 5,990,621
kWh
Natural Gas $34,314 5,438
MMBtu
Fuel Oil #6 $28,927 6,954
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.7229: Air condition only space necessary $2,708 $7,000 - - $2,708
-
MMBtu
-
02 2.2113: Repair or replace steam traps $2,582 - $2,773
32,532
kWh
- $2,309
-
MMBtu
$(-2,500.0)
03 2.7261: Install timers and/or thermostats $246 $212 $25
293
kWh
$221
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $911 $485 $(-75.0)
(-879)
kWh
- $986
-
MMBtu
-
05 2.1332: Convert combustion equipment to burn natural gas $11,500 - $16,062
188,453
kWh
$(-4,562.0)
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $1,024 $241 $1,024
12,016
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,097 - $4,097
48,066
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,983 - $11,016
129,250
kWh
- - $(-33.0)
TOTAL RECOMMENDED $34,051 $7,938 $34,922
409,731
kWh
$(-4,341.0)
-
MMBtu
$6,003
-
MMBtu
$(-2,533.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs