| Assessment Year | 1991 |
|---|---|
| Principal Product | STAINLESS STEEL WIRE |
| NAICS |
n/a
|
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 122 |
| Plant Area |
n/a
|
| Annual Production | 2,500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Rhode Island |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $510,606 | 5,990,621 |
kWh
|
$0.085 |
| Natural Gas | $34,314 | 5,438 |
MMBtu
|
$6.31 |
| Fuel Oil #6 | $28,927 | 6,954 |
MMBtu
|
$4.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,051 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7229: Air condition only space necessary | $2,708 | $7,000 | - | - |
$2,708
-
MMBtu
|
- | |
| 02 | 2.2113: Repair or replace steam traps | $2,582 | - |
$2,773
32,532
kWh
|
- |
$2,309
-
MMBtu
|
$(-2,500.0) | |
| 03 | 2.7261: Install timers and/or thermostats | $246 | $212 |
$25
293
kWh
|
$221
-
MMBtu
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $911 | $485 |
$(-75.0)
(-879)
kWh
|
- |
$986
-
MMBtu
|
- | |
| 05 | 2.1332: Convert combustion equipment to burn natural gas | $11,500 | - |
$16,062
188,453
kWh
|
$(-4,562.0)
-
MMBtu
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,024 | $241 |
$1,024
12,016
kWh
|
- | - | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,097 | - |
$4,097
48,066
kWh
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,983 | - |
$11,016
129,250
kWh
|
- | - | $(-33.0) | |
| TOTAL RECOMMENDED | $34,051 | $7,938 |
$34,922
409,731
kWh
|
$(-4,341.0)
-
MMBtu
|
$6,003
-
MMBtu
|
$(-2,533.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs