5,692
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0219 #04 Y:1991 | 04 | 1991 | Install timers and/or thermostats | $6,693 | $100 | |
| MA0219 #03 Y:1991 | 03 | 1991 | Utilize higher efficiency lamps and/or ballasts | $1,604 | $446 | |
| MA0219 #02 Y:1991 | 02 | 1991 | Use waste heat from flue gases to heat space conditioning air | $30,005 | $7,000 | |
| MA0219 #01 Y:1991 | 01 | 1991 | Replace electrically-operated equipment with fossil fuel equipment | $36,849 | - | |
| MA0218 #06 Y:1991 | 06 | 1991 | Utilize higher efficiency lamps and/or ballasts | $15,262 | $15,300 | |
| MA0218 #05 Y:1991 | 05 | 1991 | Utilize energy-efficient belts and other improved mechanisms | $753 | - | |
| MA0218 #04 Y:1991 | 04 | 1991 | Install / repair insulation on steam lines | $1,981 | $726 | |
| MA0218 #03 Y:1991 | 03 | 1991 | Install compressor air intakes in coolest locations | $7,973 | $724 | |
| MA0218 #02 Y:1991 | 02 | 1991 | Use demand controller or load shedder | $14,649 | $15,470 | |
| MA0218 #01 Y:1991 | 01 | 1991 | Use adjustable frequency drive or multiple speed motors on existing system | $30,047 | $51,400 | |
| MA0217 #10 Y:1991 | 10 | 1991 | Use adjustable frequency drive or multiple speed motors on existing system | $920 | $1,839 | |
| MA0217 #09 Y:1991 | 09 | 1991 | Utilize energy-efficient belts and other improved mechanisms | $998 | - | |
| MA0217 #08 Y:1991 | 08 | 1991 | Turn off equipment when not in use | $2,370 | - | |
| MA0217 #07 Y:1991 | 07 | 1991 | Install / repair insulation on steam lines | $5,777 | $3,874 | |
| MA0217 #06 Y:1991 | 06 | 1991 | Use computer programs to optimize hvac performance | $7,199 | - | |
| MA0217 #05 Y:1991 | 05 | 1991 | Reduce fluid flow rates | $8,252 | $330 | |
| MA0217 #04 Y:1991 | 04 | 1991 | Utilize higher efficiency lamps and/or ballasts | $9,357 | $30,000 | |
| MA0217 #03 Y:1991 | 03 | 1991 | Analyze flue gas for proper air/fuel ratio | $11,453 | $1,500 | |
| MA0217 #02 Y:1991 | 02 | 1991 | Use waste heat from hot flue gases to preheat | $13,862 | $19,305 | |
| MA0217 #01 Y:1991 | 01 | 1991 | Burn a less expensive grade of fuel | $51,002 | $4,050 |