Assessment Year | 1991 |
---|---|
Principal Product | TEFLON TUBING |
NAICS |
n/a
|
SIC | 3082: Unsupported Plastics Profile Shapes |
Sales Range | $5 M to 10M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 300,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $276,343 | 3,738,570 |
kWh
|
$0.074 |
LPG | $4,303 | 428 |
MMBtu
|
$10.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,615 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $84,615 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $36,849 | - |
$87,631
861,958
kWh
|
$(-50,782.0)
-
MMBtu
|
|
02 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $30,005 | $7,000 |
$30,005
405,627
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,604 | $446 |
$1,604
21,688
kWh
|
- | |
04 | 2.7261: Install timers and/or thermostats | $6,693 | $100 |
$1,994
26,964
kWh
|
$4,699
-
MMBtu
|
|
05 | 2.2711: Utilize outside air instead of conditioned air for drying | $8,835 | $3,850 |
$2,992
40,445
kWh
|
$5,843
-
MMBtu
|
|
06 | 2.6232: Install set-back timers | $629 | $85 |
$629
8,499
kWh
|
- | |
TOTAL RECOMMENDED | $84,615 | $11,481 |
$124,855
1,365,181
kWh
|
$(-40,240.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $84,615 | $11,481 |
$124,855
1,365,181
kWh
|
$(-40,240.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs