ITAC Assessment: WV0557
ITAC logo
ITAC Assessment: WV0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wood Product Manufacturing
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 750
Plant Area 367,000
ft2
Annual Production 49,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,516,969 37,005,671
kWh
Electricity Demand $980,823 81,414
kW-mo/yr
Electricity Fees $2,427,438 -
Natural Gas $410,968 60,337
MMBtu
Other Energy $410,688 547,584
MMBtu
Waste Disposal Costs
Water Usage $3,425 582
Tgal
Water Disposal $96 582
Tgal
TOTAL YEARLY COSTS $5,750,407
RECOMMENDED SAVINGS* $184,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $137,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $65,760 $117,200 - - $65,760
-
MMBtu
- - -
02 2.2135: Repair and eliminate steam leaks $43,281 $33,600 - - $43,281
-
MMBtu
- - -
03 2.7131: Add area lighting switches $22,313 $25,000 $22,313
544,216
kWh
- - - - -
04 2.4151: Develop a repair/replace policy $13,930 $2,320 $7,530
183,656
kWh
$6,640
-
kW-mo/yr
- - - $(-240.0)
05 2.4224: Upgrade controls on compressors $14,479 $27,450 $7,948
193,862
kWh
$6,531
-
kW-mo/yr
- - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,808 - $6,277
153,087
kWh
$5,531
-
kW-mo/yr
- - - -
07 2.2511: Insulate bare equipment $3,480 $16,000 - - $3,480
-
MMBtu
- - -
08 2.4221: Install compressor air intakes in coolest locations $3,390 $1,950 $1,799
43,885
kWh
$1,591
-
kW-mo/yr
- - - -
09 3.4151: Minimize water usage $2,486 $5,600 - - - $3,425
-
Tgal
$96
-
Tgal
$(-1,035.0)
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,424 $90 $1,291
31,479
kWh
$1,133
-
kW-mo/yr
- - - -
11 2.4239: Eliminate or reduce compressed air usage $1,022 $1,365 $540
13,170
kWh
$482
-
kW-mo/yr
- - - -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $508 $2,480 $267
6,503
kWh
$241
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $184,881 $233,055 $47,965
1,169,858
kWh
$22,149
-
kW-mo/yr
$112,521
-
MMBtu
$3,425
-
Tgal
$96
-
Tgal
$(-1,275.0)
TOTAL IMPLEMENTED $137,958 $183,050 $15,745
384,021
kWh
$13,412
-
kW-mo/yr
$109,041
-
MMBtu
- - $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs